Loading...
SS9901-CS060621TCB (AECOM Turner Collie & Braden 17300 Dallas Parkway, Suite 1010, Dallas, Texas 75248 T972.735.3000 F972.735.3001 www.tcb.aecom.com June 21, 2006 Mr. Charles Ferrara President Can -Fer Construction Company 11031 Grissom Lane Dallas, TX 75229 Subject: Sandy Lake Lift Station Unit Heaters Pricing Request Dear Mr. Ferrara: Please provide pricing information for the following items at the Sandy Lake Lift Station: 1. Remove the three (3) 240 volt unit heaters that have been installed. 2. Send two (2) of the 240 volt unit heaters to the heater manufacturer to be reconfigured to 480 volt units. Turn the other three (3) heaters over to the City. 3. Install the two (2) reconfigured unit heaters. TCB has contacted Randy Wieker at Bartos Industries (214- 350 -6871 ext 124) to discuss the reconfiguration of the heaters. Mr. Wieker in turn contacted Indeeco (heater manufacturer) to discuss the cost for reconfiguration of the units. According to Indeeco, the cost to reconfigure one heater (including freight to and from the factory) is approximately $1,600. Contact Mr. Wieker to confirm the pricing and discuss the method for shipping the heaters to the Indeeco factory. We will provide the submitted pricing information to the City for their review and approval. Please feel free to contact me at 972 - 735 -3056 if you have any questions regarding this request. Sincerely, Erika K. Cooper, P.E. Project Manager Mr. Kenneth M. Griffin, P.E. — City of Coppell Mr. Rick O'Dell — City of Coppell File