SS9901-CS060621TCB (AECOM
Turner Collie & Braden
17300 Dallas Parkway, Suite 1010, Dallas, Texas 75248
T972.735.3000 F972.735.3001 www.tcb.aecom.com
June 21, 2006
Mr. Charles Ferrara
President
Can -Fer Construction Company
11031 Grissom Lane
Dallas, TX 75229
Subject: Sandy Lake Lift Station Unit Heaters Pricing Request
Dear Mr. Ferrara:
Please provide pricing information for the following items at the Sandy Lake Lift Station:
1. Remove the three (3) 240 volt unit heaters that have been installed.
2. Send two (2) of the 240 volt unit heaters to the heater manufacturer to be reconfigured to 480
volt units. Turn the other three (3) heaters over to the City.
3. Install the two (2) reconfigured unit heaters.
TCB has contacted Randy Wieker at Bartos Industries (214- 350 -6871 ext 124) to discuss the
reconfiguration of the heaters. Mr. Wieker in turn contacted Indeeco (heater manufacturer) to discuss
the cost for reconfiguration of the units. According to Indeeco, the cost to reconfigure one heater
(including freight to and from the factory) is approximately $1,600. Contact Mr. Wieker to confirm the
pricing and discuss the method for shipping the heaters to the Indeeco factory.
We will provide the submitted pricing information to the City for their review and approval. Please feel
free to contact me at 972 - 735 -3056 if you have any questions regarding this request.
Sincerely,
Erika K. Cooper, P.E.
Project Manager
Mr. Kenneth M. Griffin, P.E. — City of Coppell
Mr. Rick O'Dell — City of Coppell
File