Loading...
ST9902-CS060623 THE.CITY.OF COPPELL Lance Smith, Project Manager Tiseo Paving Company 419 E. Hwy 80 Mesquite, TX 75105 June 23, 2006 RE: West Sandy Lake Road Project # ST 99-02A Progress Meeting Scheduled Dear Mr. Smith: This letter is to notify you of a meeting scheduled for Thursday, July 13 at 2:00 p.m. in the second floor conference room at Town Center. The meeting is to discuss progress made from the date the contract began to the present, and to discuss antieipated activities from the present to contract completion. Among the topics to be covered are the following: 1. Update of project schedule 2. North Coppell Road closure 3. Storm drain construction 4. Existing utilities and relocations 5. Clearing, grubbing and excavation activities 6. Stabilization on the project 7. Continuation of paving activities 8. Traffic control plan and location of devices 9. Other related topics if pertinent. dditional information, please feel free to contact me. ~ ---- Larry D vis Cons ction Inspecto Office 972/304-3684 Fax 972/304-3570 cc: Ken Griffin, P.E., Director of Engineering & Public Works Keith R. Marvin, P.E., Assistant City Engineer Matt Atkins, P.E., Teague NaIl & Perkins Art Tiseo, Tiseo Paving Company Robert Caudill, Tiseo Paving Company John Gay, Tiseo Paving Company 255 PARKWAY * P.O BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 MESSAGE CONFIRMATION 06/29/2006 13:27 ID =C I T'( CiF CCiPPELL ENGP. DEPT. DATE TIME S, P- T I r'lE D I '3THt-H ~=;THT I CiH I D f1CiDE PAGES PESULT 06/29 13 : 26 00'2E," '3722165637 CALL I tll::i 01 CiV 0000 1~ 0000 >1Ci TO 9NliitO L I, 6.[ N J--- 8t'Zt'TScc.::'..6 "OT,cO OZ:D 6c/90 I TIS~d '3~::ltJd ~aCiW iJI tlCiI ltJI'3 It~tJIS IG ~l,j Il-d 's ~l-<jII ~ltJa 'Id~a 'd9N~ ii~ddCiJ ~Ci AIIJ=aI [[ : n 900c,/6c/90 NOI1~WdI~NOJ 39~SS3W