St Ann Catholic-CS060601DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM. Third Replat of Saint Ann Catholic Church, Replat to relocate the fire lane
and various utility easements allowing the expansion of church facilities into
the former Georgetown Shopping Center, on approximately 19.52 acres of
property located at the northeast corner of Sandy Lake Road and Samuel
Boulevard, at the request of Jennifer Lindsey, St. Ann Catholic Parish.
STAFF REP.: Gary Sieb PROJECT ID# RP -06 -0024
DRC DATE: May 25, 2006 and June], 2006
[ CONTACT: Kenneth M. Griffin, P.E., Dir.of En ineerin /Public Works 9721304 -3686
COMMENT STATUS: ✓FINAL REKIS-9B
1. Will modifications to the existing water system be required in order for the relocated
fire lane to be compliant pertaining to fire hydrant spacing? If so, include a plan.
2. Proposed paving should not encroach into the fire lane.
Additional comments may be generated upon detailed engineering review.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM. S- 1121R -SF -9, St. Ann Catholic Parish zoning change request from S -1121-
SF-9 (Special Use Permit -1121- Single Family -9) to S- 1121R -SF -9 (Special
Use Permit -1121 Revised Single Family 9), to amend the existing SUP site
plan to allow the renovation and expansion of church uses into the former
Georgetown Shopping Center, including stucco exterior, adding a playground,
additional parking and landscaped areas on approximately 19.52 acres of
property located at the northeast corner of Sandy Lake Road and Samuel
Boulevard, at the request of Jennifer Lindsey, St. Ann Catholic Parish.
STAFF REP • Gary Sieb PROJECT ID# SUP -06 -0019
DRC DATE: May 25, 2006 and June], 2006
CONTACT: Kenneth M.
COMMENT STATUS:
P.E.. Dir.ofEngineerin IPublic Works 9721304 -3686
AV :_
No Comments.