Loading...
Denton Tap 3A-CS060630To: From: Date: June 30, 2006 T H E •C 1 T Y •O F COPPELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING Ken Griffin, Director of Engineering Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Larry Davis, Construction Inspector Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 RE: WALK -THRU INSPECTION for Denton Tap Development, Lot 3 Block A (Coppell Montessori Academy) A final walk -thru for paving, utilities and drainage on the referenced project has been scheduled for: Thursday, July 6th at 9:00 a.m. Please let me know if I can be of further assistance. cc: Ken Head, Head Construction fax 214/722 -7635 "CITY OF COPPELL ENGINEERING EXCELLENCE BY DESIGN"