DR9801-CN 990106 CHANGE ORDER
NUMBER TWO
JANUARY 6, 1999
WRIGHT CONSTRUCTION CO., INC. DRAINAGE & PAVING IMPROVEMENTS
601 W. WALL ST. SOUTHWESTERN DR., FREEPORT PARKWAY,
GRAPEVINE, TEXAS 76051 AND FROM FRITZ RD. TO GRAPEVINE CREEK
THE CITY OF COPPELL PROJECT # DR98-01 ENGINEERS PROJECT NO.
CONTRACT DATE AUGUST 3, 1998
This Change to the Contract shall become effective when it has been signed by the Owner and the Contractor. This Change Order is an
authorization to proceed with the fo_l.lo_win_g items of work.
': I~-~---E-M' .............................................. UNIT TOTAL
NO DESCRIPTION UNIT QTY PRICE AMOUNT
ITEMS TO BE ADDED TO CONTRACT
1 3" SCH 40 PVC CONDUIT LF 110 $9.50 $1,045.00
2 TY Ill END OF ROAD BARRICADE LF 160 $30.00 $4,800.00
3 2' X 3' TRAFFIC RATED CONCRETE PULL BOX EA 1 $1,200.00 $1,200.00
4 2' X 3' STANDARD CONCRETE PULL BOX EA 1 $900.00 $900.00
NET INCREASE TO CONTRACT $7,945.00
The Contract Time shall be increased 1 working day as a result of the work required in this change. All requirements of the original Contract Documents
shall apply to the above work except as may be specifically modified above.
We hereby agree to the above change as outlined and the Contrac~ Sum and Time shall be modified as follows
Contract Sum Ti__me
Original Contract ............................................. $541,774.00 90 WORKING DAYS
Previou.~ Changes ......................................... $37,696.00 t0 WORKING DAYS
This Change Order ................................................... $7,945.00 t WORKING DAYS
Total Changes to Date ............................................................................................... $45,641.00 11 WORKING DAYS
Total Contract to Date ................................................................................................ $587,415.00 101 WORKING DAYS
APPROVED: APPROVED:
HALFF ASSOCIATES, INC. (ENGINEER) WRIGHT ~ONST.
By: .a,.~ ~... By:
TITLE: ~-. z 'T. ~ TITLE:
DATE: P~-'/~ -'~'-~. DATE:
APPROVED: ~~ APPROVED:
DATE: ,.' - ¢" ~- ,f'~ DATE: