Loading...
Belt Line Trade-LR060705 REED EnGinEERinG GEOTECHNICAL AND G R CJ U F' ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Belt Line Trade Center Building A 500 E. Belt Line Road Coppell, Texas REPORTED TO: IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 A TIN Mr Chris Parnell CONTRACTOR: Raymond Construction Proctor No. 1 2 3 4 5 ASTM Standard 0-698 0-698 0-698 0-698 0-698 Descri tion Dark red & gray clay Orange & gray sandy clay Tan & gray sandy clay Dark brown & gray clay Light brown & gray clay w/calcareous nodules & ra shale cia lime-treated 6 0-698 Depth Below FinalS. G. feet 60 50 40 30 2.0 1 0 00 50 40 30 20 1 0 00 40 30 20 1 0 00 20 1 0 00 Field Density c 1040 1055 964 1036 1044 962 957 1033 955 104.2 1039 95.2 950 1036 1045 1047 961 958 965 999 1030 REPORT NO. 29 REPORT DATE: 07-05-06 REG PROJECT NO. 13335 TECHNICIAN: G Green PAGE: 1 of 2 Optimum Moisture, % 186 164 10.9 206 21.2 18.9 Field Moisture % 17.2 165 21 4 176 168 21 6 21 8 179 221 170 174 22.3 22.5 17 1 16.9 167 21 4 21 7 196 21 7 187 7' ~ f&tJ 'L. Test No. 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 Dale L2 lion 06-20-06 Sanitary Line 1 ST A 10+40 Sanitary Line 1 ST A 10+41 Sanitary Line 1 ST A 10+42 Sanitary Line 1 ST A 10+43 Sanitary Line 1 ST A 10+44 Sanitary Line 1 ST A 10+45 Sanitary Line 1 ST A 10+46 Sanitary Line 1 ST A 7+50 Sanitary Line 1 STA 7+51 Sanitary Line 1 ST A 7+52 Sanitary Line 1 STA 7+53 Sanitary Line 1 STA 7+54 Sanitary Line 1 STA 7+55 Sanitary Line 1 STA 4+30 Sanitary Line 1 STA 4+31 Sanitary Line 1 STA 4+32 Sanitary Line 1 ST A 4+33 Sanitary Line 1 ST A 4+34 06-21-06 Fire Lane 150'N, 10'W(1 Fire Lane 150'N, 1 ' Fire Lane 150' 101 1 Proctor Compaction 10 Level % 2 96.8 2 98.2 5 977 2 965 2 97.2 5 976 5 971 2 96.2 5 969 2 970 2 967 5 966 5 963 2 965 2 973 2 975 5 975 5 97.2 1 955 4 97.2 2 959 2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214] 3505600 . F" [214] 3500019 REPORT NO. 29 REPORT DATE. 07-05-06 REG PROJECT NO. 13335 PAGE. 2 of 2 Depth Below Field Field Test Final S. G. Density Moisture Proctor Compaction No. Date Location feet c % 10 Level % 434 06-22-06 Water Line 150'N, 200'W(2) 20 940 22.9 5 953 435 Water Line 150'N, 201 'W(2) 1 0 1120 12.8 3 95.8 436 Water Line 150'N, 202'W(2) 00 948 22.3 5 961 437 Water Line 50'S, 75'E(2) 2.0 1034 174 2 963 438 Water Line 51 'S, 75'E(2) 1 0 1031 176 2 96.0 439 Water Line 52'S, 75'E(2) 00 1124 12.0 3 96.2 440 06-24-06 Bldg Pad B.2-3 30 112 1 12.8 3 959 441 Bldg Pad B.2-3 1 20 1127 12.2 3 964 442 Bldg Pad B.2-3 3 1 0 983 189 1 973 443 Bldg Pad B.2-3 4 00 1038 171 2 966 444 Bldg Pad B.2-6 5 2.0 103.2 174 2 961 445 Bldg Pad B.2-6 6 1 0 979 19.2 1 96.9 446 Bldg Pad B.2-6 7 00 976 194 1 966 447 06-24-06 Bldg Pad 80'N, 80'W(3) 30 1130 11 5 3 967 448 Bldg Pad 80'N, 240'W(3) 30 1134 11 7 3 970 449 Bldg Pad 50'N, 80'W(3) 30 112.8 11 9 3 96.5 450 Bldg Pad 50'N,240'W(3) 30 1038 174 2 966 451 Bldg Pad 20'N, 80'W(3) 30 104.2 168 2 970 450 Bid Pad 20'N, 240'W 3 30 1124 12.3 3 96.2 Comments Where tested, materials were in compliance with project specifications Footnotes (1) Measurements referenced from S W building corner (2) Measurements referenced from N E. building corner (3) Measurements referenced from S E. building corner Mail Distribution: (1) IDI/Mr Chris Parnell (1 ) Raymond Construction/ Mr David Layne (1) City of Coppell/Mr Larry Davis (1 ) City of Coppell/Mr Lee Stone Submitted by' REED ENGINEERING GROUP, LTD. Originai Signed By Bill Woolwine Sr. Manager, CMT BW/rs REED EnGinEERinG GEOTECHNICAL AND G R CJ U F' ENVIRONMENTAL CONSULTANTS REPORT OF FIELD DENSITY TESTS Belt Line Trade Center Building A 500 E. Belt Line Road Coppell, Texas REPORTED TO: IDI REPORT NO. 25 5420 LBJ Freeway, Suite 1275 REPORT DATE: 07-05-06 Dallas, Texas 75240 REG PROJECT NO. 13335 ATTN Mr Chris Parnell TECHNICIAN: G Green PAGE: 1 of 2 CONTRACTOR: Raymond Construction Proctor ASTM Optimum No. Standard Descri tion Moisture, % 1 0-698 Dark red & gray clay 186 2 0-698 Orange & gray sandy clay 164 3 0-698 Tan & gray sandy clay 109 4 0-698 Dark brown & gray clay 206 5 0-698 Light brown & gray clay w/calcareous 21.2 nodules 6 0-698 Red brown & ra shale cia lime-treated 18.9 101 1 Depth Below Field Field Test Final S. G. Density Moisture Proctor Compaction No. Date Location feet c % 10 Level % 393 06-14-06 Storm Line B ST A 0+50 30 1035 173 2 964 394 Storm Line B ST A 0+50 2.0 1038 170 2 966 395 Storm Line B ST A 0+50 1 0 1041 16.8 2 969 396 Storm Line B ST A 0+50 00 1047 166 2 975 397 Storm Line B ST A 2+00 30 993 21 3 4 966 398 Storm Line B ST A 2+00 20 995 21 0 4 968 399 Storm Line B ST A 2+00 1 0 1045 165 2 973 400 Storm Line B STA 2+00 00 112.7 126 3 964 401 Storm Line B ST A 9+50 30 1130 120 3 967 402 Storm Line B ST A 9+50 20 99.2 21 5 4 965 403 Storm Line B STA 9+50 1 0 112.8 12.2 3 965 404 Storm Line B STA 9+50 00 988 21 7 4 961 405 Storm Line B STA 11+50 30 973 196 1 963 406 Storm Line B ST A 11 +50 20 975 194 1 965 407 Storm Line B ST A 11 +50 1 0 977 191 1 967 408 Storm Line B ST A 11 +50 00 981 188 1 971 409 Storm Line B ST A 13+00 30 1001 208 4 974 410 Storm Line B ST A 13+00 20 1135 11 5 3 971 411 Storm Line B ST A 13+00 1 0 1133 11 8 3 969 412 Storm Line B ST A 13+00 00 1137 11 3 3 973 2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214] 3505600 . FAX [214J 3500019 REPORT NO 25 REPORT DATE. 07-05-06 REG PROJECT NO. 13335 PAGE. 2 of 2 Comments. Where tested, materials were in compliance with project specifications Mail Distribution: (1) 10l/Mr Chris Parnell (1) Raymond Construction/ Mr David Layne (1) City of Coppell/Mr Larry Davis (1) City of Coppell/Mr Lee Stone Submitted by' REED ENGINEERING GROUP, LTD. Original Signed By Bill Woolwine Sr Manager, CMT BW/cn