MEMORANDUM
V'tl ~ i ~~
TO: Larry Davis, Engineering
FROM: Danny Hightower, Public Works ~~~~`
DATE: August 23, 200b
REF: Walk thru for Amberpoint
1 Mark DOM and IRR in blue on curb for three domestic and three irrigation meters
2. Mark MLV in blue on curb
3 Drainage around two vaults
4 Check paperwork on DC vaults, Dom, lrr / ~~
5 Blue street marker buttons for FH
b Clean meter cans oa Dom and Irr
7 Reset FH valve stack (northeast of building)
8_ Valve to vault at northeast of building needs ext.
9. Valve on stub out at Freeport needs ext.
10 Test DC at irrigation, northeast of building next to vault
11 Need blocking in two vaults
12. Missing valve: mark MLV in blue on curb
13 FH southwest of building leaking at top
14. FH (third from southeast of building, off Freeport) needs ext
15. Same FH as above needs oil
16. All manholes need ran pans
17 #4 manhole not to grade
18. Mark MH in red on curb at all manholes
19. #6 manhole on south side of building need cleaning
20 #7 manhole just 30' south of #6 manhole needs cleaning
21. #1 manhole has no flow; clean to flow
~Z , give s- a ~~ W, Sua.,P ,~~t. R; - '7YyI+~
y
Ga11 972-462-5 1 50 to schedule Danny Hightower to check punch list when completed.
T~
s
g z~~f
Aug 22 06 08~49a Streets Dept.
972-462-5199 p 1
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Larr}~ Davis, Construction Inspector Engineering
From: Terry Gaona, Streets Division Public Works
Date: August 22, 2Q06
RE: Walk-thru for Amberpoint ~~
1. Contractor still working on Sandy Lake Side. Everything else OK.
~l~
B~LZ"O~/
CITY OF COPPE4L PUBLIC W'ORXS DEP~1RTAtENT
~1EEE~EE ~`~~JF I F t~~T I ~~
G8. 29 '2UU6 U9.54
I L~=C I T' ~ OF ~vOPPELL EhJGR DEPT .
DATE TIh1E S,R-TIME DISTANT STATION ILA MODE PAGES RESULT
Gb. 29 US 53 t~G' ~4 " 214 962 3I~U 1 BALL I hdG 82 Uk ~0~~