Loading...
Amberpoint BP 2R-CS060816T H E G I T Y O F COPPELL r T ~. _, ~ ~ o F X ~ ~ - ~ ~ q MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To Ken Griffin, P.E , Dir of Engineering /Public Works Keith Marvin, P E., Asst. City Engineer Glenn Hollowell, Asst. Dir of Public Works Lee Stone, Commercial Bldg. Inspector Tim Oates, Fire Marshal From. Larry Davis, Constniction Inspect~~ ~~ Office Phone (972) 304-3684 Fax (972) 304-3570 Date August 16, 2006 RE WALK-THRU INSPECTION Amber Point, Lot 2R, Block A, Buildings 4,5 & 6 FILE A final walk-thru for paving, utilities and drainage on the referenced project has been scheduled for: Monday, August 21, 2006 at 9 a.m. Please let me know ~f I can be of further assistance ec Mark McGraw, P.E , Halff Associates fax # 214/361-5573 Scott Langhain, Prod Mgr , Trt-Dal, LTD 817/481-8195 Brandon Hanachik, Prod Mgr ,Rogers- O'Brien 214/962-3001 Matt Letlow, Prod Mgr ,Potter Concrete 214/631-4306 255 PARKWAY * P O BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673