Amberpoint BP 2R-CS060816T H E G I T Y O F
COPPELL
r
T ~. _, ~ ~ o
F X ~ ~ - ~ ~ q
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To Ken Griffin, P.E , Dir of Engineering /Public Works
Keith Marvin, P E., Asst. City Engineer
Glenn Hollowell, Asst. Dir of Public Works
Lee Stone, Commercial Bldg. Inspector
Tim Oates, Fire Marshal
From. Larry Davis, Constniction Inspect~~ ~~
Office Phone (972) 304-3684
Fax (972) 304-3570
Date August 16, 2006
RE WALK-THRU INSPECTION
Amber Point, Lot 2R, Block A, Buildings 4,5 & 6
FILE
A final walk-thru for paving, utilities and drainage on the referenced project has been
scheduled for: Monday, August 21, 2006 at 9 a.m.
Please let me know ~f I can be of further assistance
ec Mark McGraw, P.E , Halff Associates fax # 214/361-5573
Scott Langhain, Prod Mgr , Trt-Dal, LTD 817/481-8195
Brandon Hanachik, Prod Mgr ,Rogers- O'Brien 214/962-3001
Matt Letlow, Prod Mgr ,Potter Concrete 214/631-4306