Loading...
Amberpoint BP 2R-LR060705CONCRETE COMPRESSIVE STRENGTH TEST Report Number 94051418 0480 lf~rracon Service Date June 22, 2006 8901 Carpenter Frwy Ste #100 Dallas Texas 75247 (214) 630-1010 Client Report Date July 05 2006 Transwestern Commercial Services Project. Am e~TF ~o n'~t B slu Hess Part Attn David Gunderson Ings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No 94051418 Material Information Specified Strength 3600 psi @ 28 Days Batch Time 5 08am Plant: 2 on site Supplier Potter Concrete Truck No 103 Ticket No 102340 Mix I D No 7752 Water Added Onslte Before Test: 0 Gallons Water Added Onsite After Test 0 Gallons Field Test Dafa Test _ Result Slump, inches 4 25 Alr Content, % 3 8 Concrete Temperature, °F 85 Ambient Temperature °F 78 Plastic Unit Weight, pcf~ 146 2 Laboratory Test Data Set Specimen Diameter Area No ID (inches) (sq inches} 1 1 6 00 28 27 2 6 00 28 27 1 3 1 4 06/29/2006 7 99,180 3,510 Average (7 Days) 3,510 07/20/2006 28 07/20/2006 2$ Services - Obtain sampies of fresh concrete at the placement locations perform required field tests and cast compressive strength samples 7- /3 0 o~ The tests were performed in general accordance with applicable ASTM AASHTO or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Sample Information Date Cast: June 22, 2006 Time 5 35am Sampled by Eric G Jernigan Weather Conditions Partly cloudy humid Accumulative Yards 500 Batch Size (cy) 30 00 Placement Method Chute Sample Locations Set #1 location, see attached sketch Placement Location Parking Paving and Fire Lane on NE side of Building 5 Specification _ Test Method 3-5 ASTM C 143 3-6 ASTM C231 ASTM C1064 ASTM C1064 r ASTM C138 Age at Maximum Compressive D e at T st a Load Strength Tested (days) (Ibs) (psi) 06/29/2006 7 98,900 3,500 Page 1 of 4 o~_EM~~~,-F~~~,e Kev GONCRETE COMPRESSIVE STRENGTH TEST Report Number 94051418 0480 Service Date June 22, 2006 l~~rracon 8901 Carpenter Frwy Ste #1 DO Dallas Texas 75247 (214) 630-1010 Client. Report Date July 05 2006 Transwestern Commercial Services Project AmberPoint Business Park Attn David Gunderson Buildings 4 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell TX Project No 94051418 Material Information Specified Strength 3600 psi @ 28 Days Batch Time 23am Plant: 2 on site Supplier Potter Concrete Truck No 101 Ticket No 102355 Mlx l D No 7752 Water Added Onslte Before Test: 0 Gallons Water Added Onslte After Test 0 Gallons Sample Information Date Cast: June 22, 2006 Time 7 50am Sampled by Erlc G Jernigan Weather Conditions Cloudy, overcast, humid Accumulative Yards 500 Batch Slze (cy) 180 00 Placement Method Chute Sample Locations Set #2 location see attached sketch Placement Location Paving Parking and Fire Lane on N side of Building 5 Field Test Data Test Result Specification Test Method Slump, inches 4 00 3-5 ASTM C143 Air Content, °~0 3 5 3-6 ASTM C231 Concrete Temperature, of g0 ASTM C1064 Ambient Temperature, °F 82 ASTM C1064 Plastic Unlt Weight, pcf 142 2 ASTM C138 Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No 1D (inches) (sq inches) Tested (days) (Ibs) (psi) 2 1 6 00 28 27 06/29/2006 7 100,670 3,560 2 2 6 00 28 27 06/29/2006 7 104,160 3,680 Average (7 Days) 3,620 2 3 07/20/2006 28 2 4 07/20/2006 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples The tests were performed in general accordance with applicable ASTM AA5HT0 or DOT test methods This report is exclusively for the use of fhe clienf indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested of the location(si referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 2 of 4 0, EM~,R9,-~~,~,e Krv CONCRETE COMPRESSIVE STRENGTH TEST Report Number- 94051418 0480 Service Date June 22, 2006 l~~rr~con 8901 Carpenter Frwy Ste #100 Dallas Texas 75247 (214) 630-1010 Client Report Date July 05, 2006 Transwestern Commercial Services Project AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell TX Project No 94051418 Material Information Specified Strength 3600 psi @ 28 Days Batch Time 9 52am Plant. 2 on site Supplier Potter Concrete Truck No 107 Ticket No 102370 Mix I D No 7752 Water Added Onslte Before Test : 0 Gallons Water Added Onslte After Test: 0 Gallons Field Test Data Test _ Result Slump, inches 3 50 Air Content, °% 3 3 Concrete Temperature, of 94 Ambient Temperature of 91 Plastic Unit Weight, pcfi 146 4 Laboratory Test Data Set Specimen Diameter Area No ID _ (inches) (sq inches) 3 1 6 00 28 27 3 2 6 00 28 27 3 3 3 4 Sample Information Date Cast June 22, 2006 Time 10 25am Sampled by Erlc G Jernigan Weather Condltlons Overcast, cloudy Accumulative Yards 500 Batch Size (cy) 330 00 Placement Method Chute Sample Locations Set #3 location see attached sketch Placement Location Parking, Paving and Fire Lane on NE side of Building 5 Specification Test Method 3-5 ASTM C143 3-6 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 06/29/2006 7 111,930 3,960 06/29/2006 7 111,590 3,950 Average (7 Days) 3,960 07/20/2006 28 07/20/2006 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples The tests were performed in general accordance with applicable ASTM AASHTO or DOT test methods This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the locations i referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 3 of 4 °'_~"";"°' ""°,r"`" CONCRETE COMPRESSIVE STRENGTH TEST Report Number 94051418 0480 Service Date June 22, 2006 l~~rracon 8901 Carpenter Frwy Ste #100 Dallas Texas 75247 (214)630-1010 Client. Report Date July 05 2006 Transwestern Commercial Services Project AmberPomt Busyness Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell TX Project No 94051418 Material Information Specified Strength 3600 psi @ 28 Days Batch Time 12 24pm Plant: 2 on site Supplier Potter Concrete Truck No 103 Ticket No 10285 Mlx I D No 7752 Water Added Onsite Before Test: 0 Gallons Water Added Onsite After Test: 0 Gallons Field Test Data Test Result Slump, inches 5 00 Alr Content, % 3 g Concrete Temperature, °F g5 Ambient Temperature ~F 93 Plastic Unlt Weight, pcf 146 4 Laboratory Test Data Set Specimen Diameter Area No ID (inches) (sq inches) 4 1 6 00 28 27 Sample Information Date Cast: June 22, 2006 Time 1 20pm Sampled by Erlc G Jernigan Weather Condltlons Sunny, hot and humid Accumulative Yards 500 Batch Size (cy) 480 00 Placement Method Chute Sample Locations Set #4 location, see attached sketch Placement Location Paving, Parking & Fire Lane on N side of Budding 5 Specification 3-5 3-6 Test Method ASTM C 143 ASTM C231 ASTM C 1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs} (psi) 06/29/2006 7 90,470 3.200 4 2 6 00 28 27 06/29/2006 7 87,030 3,080 Average (7 Days) 3,140 4 3 07/20/2006 28 4 4 07/20/2006 28 Services - Obtain samples of fresh concrete at the placement locations, perform required field tests and cast compressive strength samples Terracon Rep Eric G Jernigan Report Dlstr!bution i 1) Transwestern Commercial Services i 1 J TechniStructures , i t City of Coppeu TX i 9) Rogers O'Bren Construction Co R2VIeWed by (1) City of Coppell TX Hussein H Abusaad P E t11 O'Brien & Assoc Senior Project Manager The tests were performed in general accordance with applicable ASTM AASHTO or DOT test methods This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials Page 4 of 4 ~, EM~,R~,-F~~~,e Key