Loading...
Amberpoint BP 2R-LR060630REPORT OF REINFORCING STEEL OBSERVATION lf~rr~c®n Consultlnp Enp3neers & Sclentlsts 8901 Carpenter Frwy Suite #100 Dallas, Texas 75247 !2141630-1010 Date of Service 06/30/06 Report No Client No 50854 Project No Client Transwestern Commercial Services Project: 5001 Spring Valley Rd Ste 600 W Dallas, TX 75244 Services Observe placement of reinforcing for compliance with fury PROJECT DATA Drawings Utilized CO O1 and C1 O1, dated 04/10/06 94051418 0498 94051418 AmberPomt Business Park Buildings 4, 5 and 6 505 South Royal Lane Coppell, TX ushed drawings. Locations/Items Observed NE and E Pavement, Parking and Fire Lane of Building #6 Test Method Visual Obsen~ation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Bar Suppor's X Lapped Splices X Number of Bars X Proper CoverlClearance X ~iscrepancies~comments. Any discrepancies found were corrected at the lime of this observation unless otherwise noted Field Results Report To Technician E Jernlgan Report Distribution. (1) Transwestern Commercial Services (1) Rogers O'Brien Construction Co (1) City of Coppeil TX (1) O'Brien & Assoc {1) City of Coppell TX (1) TechniStructures Hussein H. Abusaad, P.E Senior Project Manager 309acs This report is exclusively for the use of the client indicated above and shall not be reproduced without wntlen approval of Terracon.