DR9801-CS 990202 TUE 16:42 FAX 214 361 5573 HALFF ASS0C INC [~002 Summary Offsite Drainage and Paving Improvements On-site Meeting No. 7 February 2, 1999 Halff Associates arrived on site at approximately 10:30 am on February 2 to discuss construction, landscaping, and inspection issues. The meeting began approximately at 10:30 am and concluded at approximately 11:15 am. During this time discussions about construction, landscaping, and inspection issues were held; however, not all attendees were present for all discussions. I. Participants Name Organization Phone FaxkE-mail Todd Jackson Halff Associates 214-346-6246 214-739-0095 Brian Bristow Halff Associates 214-346-6267 214-739-0095 Jay Hearne Wright Construction 817-481-2594 817-481-2597 Matt Davis Landscape Design & Con. 972-247-3121 972-247-0426 Robert McCann Catellus Dev. Corp. 972-719-6128 972-719-6149 II. Issues Discussed Item Action Description 7.1 Wright/Sutton At the 60" RCP site, Wright still needs to place riprap and grade at the headwall to provide for positive drainage to the creek. At the 54" RCP site, Sutton has poured both lanes at the intersection with Freeport Parkway. Sutton still needs to install brick pavers, install 2 concrete pull boxes including the Y' PVC, seal . the joints, pave in front of the curb inlet, and extend the curb from the curb inlet to the north to the existing curb. Erosion control is needed in front of the curb inlet until Sutton paves that area. At the box culvert site, Sutton has completed the pavement replacement except for sealing the joints which will be done along with the pavement at the intersection of Freeport Parkway and 1-635. Wright still needs to place riprap around both headwalls and grade around both headwalls to provide positive drainage through the system. 7.2 Wright Upon completion of the construction, Wright will grass the sites. 7.3 Sutton Sutton is to install a traffic-bearing concrete pull box on the 54" RCP site at the location of the existing pull box. Another concrete pull box is to be installed outside the pavement to the south and 3" PVC conduit will connect the two boxes, 7.4 Sutton The color and pattern of the brick pavers to be used at the 54" ReP site shall be the City of Coppell standard. 7.5 Wright Wright will place riprap around all headwalls this week (weather permitting). 7.6 LDC LDC needs to coordinate with TU Electric for their power source for the irrigation system on the south side of Grapevine Creek. 7.7 Sutton Sutton needs to cleanup the construction site. 02/02/99 TUE 16:43 FAX 214 361 5573 HALFF ASSOC INC ~003 Additions and corrections to these minutes should be sent to Todd Jackson by phone at (214) 346-6246 or by fax at (214) 361-5573 within five (5) working days. If no corrections are noted, minutes will be assumed correct. HALFF ASSOCIATES, INC. Todd lackson