Loading...
Amberpoint BP 2R-LR060626CONCRETE COMPRESSIVE STRENGTH TEST b 94051418 0418 l~~rracon Report Num er 8901 Carpenter Frwy, Ste #100 Service Date May 26, 2006 Dallas, Texas 75247 (214) 630-1010 Client: Report Date June 26, 2006 Transwestern Commercial Services Project• AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No • 94051418 Material Information Specified Strength 4600 psi @ 28 Days Batch Time 5 50am Plant 2 Supplier Potter Concrete Truck No 104 Ticket No 101855 Mix I D No 7723 Water Added Onsite Before Test. OGallons Water Added Onsite After Test. 0 Gallons Field Test Data Test Result Slump, inches. 3.25 Air Content, % 2 8 Concrete Temperature, aF 85 Ambient Temperature,~F 75 Plastic Unit Weight, pcf~ 144 1 Sample Information Date Cast. May 26, 2006 Time 620am Sampled by Eric G Jernigan Weather Conditions Partly sunny, humid Accumulative Yards 20/340 Placement Method Direct Discharge Sample Locations See attached sketch for Location #1 Placement Location Pavement, Parking and Fire Lane Specification 3-5 3-5 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 • =Field Test Results do not meet project specifications. Laboratory Test Data Age at Maximum Compressive Set Specimen Diameter Area Date Test Load Strength No ID (inches) (sq inches) Tested (days) (Ibs) (psi) 1 1 6 00 28 27 06/02/2006 7 106,930 3,780 2 6 00 28 27 06/02/2006 7 135,100 4,780 Average (7 Days) 4,280 3 6 00 28.27 06/23/2006 28 134,120 4,740 4 6 00 28 27 06/23/2006 28 155,840 5,510 Average (28 Days) 5,130 Services - n/a The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 1 Of 3 oi-acsiaoi wn,~e Kav CONCRETE COMPRESSIVE STRENGTH TEST Report Number 94051418 0418 Service Date May 26, 2006 l~~rracon 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-101 D Client Report Date June 26, 2006 Transwestern Commercial Services Project: AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No 94051418 Material Information Sample Information Specified Strength 4600 psi @ 28 Days Date Cast. May 26, 2006 Time 8.25am Sampled by Eric G Jernigan Batch Time 8 02am Plant. 2 Weather Conditions Sunny, clear, nice Supplier Potter Concrete Accumulative Yards 170/340 Truck No 110 Ticket No 101870 Placement Method Direct Discharge Mix I D No 7723 Sample Locations See attached sketch for Location #2 Water Added Onsite Before Test. 0 Gallons Placement Location Pavement, Parking and Fire Lane Water Added Onsite After Test 0 Gallons Field Test Data Test Slump, inches Air Content, Concrete Temperature, ~F Ambient Temperature,~F Plastic Unit Weight, pcf~ Laboratory Test Data Set Specimen Diameter Area No. ID (inches) (sq inches} 2 1 6 00 28 27 2 2 6 00 28 27 Result Specification 5 00 3-5 4 5 3-5 8s 80 2 3 6 00 28 27 2 4 6 00 28 27 Comments 'Does not comply with specified strength SefVICeS - fl/a Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi) 06/02/2006 7 107,020 3,780 06/02/2006 7 104,090 3,680 Average (7 Days) 3,730 06/23/2006 28 122,360 4,330* 06/23/2006 28 147,170 5,200 Average (28 Days) 4,770 Not tested for plastic unit weight. The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 2 of 3 m-ncs~aoi Fw~,e Kev CONCRETE COMPRESSIVE STRENGTH TEST Report Number 94051418 0418 Service Date May 26, 2006 Sample Information Date Cast. May 26, 2006 Time 10 30am Sampled by Eric G Jernigan Weather Conditions Sunny, nice Accumulative Yards 320/340 Placement Method Direct Discharge Sample Locations See attached sketch for Location #3 Placement Location Pavement, Parking and Fire Lane Client Report Date June 26, 2006 Transwestern Commercial Services Project: AmberPoint Business Park Attn David Gunderson Buildings 4, 5 and 6 5001 Spring Valley Rd Ste 600 W 505 South Royal Lane Dallas TX 75244 Coppell, TX Project No. 94051418 Material Information Specified Strength 4600 psi @ 28 Days Batch Time 10 OOam Plant 2 Supplier Potter Concrete Truck No 107 Ticket No 101885 Mix I D No 7723 Water Added Onsite Before Test. OGallons Water Added Onsite After Test 0 Gallons Field Test Data Test Result Slump, inches 3 50 Air Content, % 3 7 Concrete Temperature, ~F 89 Ambient Temperature,~F 83 Plastic Unit Weight, pcf~ Laboratory Test Data Set Specimen Diameter Area No ID (inches) (sq inches) 3 1 6 00 28.27 3 2 6 00 28.27 3 3 6 00 28.27 3 4 6 00 28.27 Specification 3-5 3-5 l~~rr~con 8901 Carpenter Frwy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Test Method ASTM C143 ASTM C231 ASTM C1064 ASTM C1064 ASTM C138 Age at Maximum Compressive Date Test Load Strength Tested (days) (Ibs) (psi} 06/02/2006 7 131,390 4,650 06/02/2006 7 125,280 4,430 Average (7 Days) 4,540 06/23/2006 28 154,600 5,470 06/23/2006 28 166,570 5,890 Average (28 Days) 5,680 COI7lments Not tested for plastic unit weight. SefVICeS - n/a Terracon Rep Eric G Jernigan Report Distribution (1) Transwestern Commercial Services (1) TechniStructures (1) City of Coppell TX (1) Rogers O'Brien Construction Co Reviewed by s' (1) City of Coppell TX Hussein H Abusaad, P E. (1) O'Brien & Assoc Senior Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. Page 3 Of 3 ovacsiROVw~~.e kaY moo a moo ~3 ~' OdD ~1 ~P _ ~~ ~.~, ~ _ ~- 1 Lt ;` ~ ~: ~ ~ ~ ~ ~, ~ ~ ~ y ~, Z 2 ~ `~J ~ ~ ~ ~ry ~ ~ ~ ~~ ~ ~~ ~~ ~ ~ ~,.. ~~ ',~ ` wa~~ ~` :~ ~ ~. ,- _ a5'~~ _b6 z~ ~ a 6 caa REpoR~ ao. / // _' ~Pv~~ ~~ ~ERRQ l..E~H~ • .... r „_,7 (s ~A~ bS i ~ Pars-~' N ~- (, Q