Loading...
DR9801-CS 990127FRI 13:01 FAX 214 361 5573 HALFF ASSOC INC [~002 Weekly Progress Report Offsite Drainage and Paving Improvements Progress Report No. 6 Date: January 27, 1999 Time: 2:30 PM Temp: 70's Weather: sunny Contr. Wright Construction Crew: 0 Equip.: none Halff Associates arrived on site at approximately 2:30 pm on January 27 for construction observation. At the 60" RCP site at Fritz Drive and Freeport Parkway, nothing new has occurred since the January 19 on-site meeting. Wright still needs to place riprap and grade at the headwall to provide for positive drainage to the creek. At the 8'x 5' box culvert site, Sutton has completed the pavement replacement except for sealing the joints which will be done along with the pavement at the intersection of Freeport Parkway and 1-635. Wright still needs to place riprap around both headwalls and grade around both headwalls to provide positive drainage through the system. At the 54" RCP and drive site at the intersection of Freeport Parkway and 1-635, all of the pavement has been poured that does not have brick pavers on top of it and the dummy joints have been sawed. All forms are installed and steel in place for areas that have not been paved. A hole was left in the pavement for the 2'x3' traffic rated concrete box to be installed. Another concrete box was found to the south of the pavement. I could not tell whether this box is to be installed at that location or this is the old box that was removed. No 3" conduit was seen at either box location. Traffic barrels were in place along Freeport Parkway. A stockpile is on site containing asphalt and concrete spoil material. Sutton stills needs to pave directly in front of the curb inlet and install a curb from the inlet north to the existing curb. An erosion control measure is needed in front of the curb inlet to keep sediments from entering the storm sewer system. It has been a pleasure working with you on this project. If you have any comments or questions, please contact me by phone at (214) 346-6246 or by fax at (214) 739-0095 Todd Jackson HALFF ASSOCIATES, INC. cc: Robert. McCann, Catellus Development Corporation Tim Mullikin, Wright Construction