Amberpoint BP 2R-CS060907Rogers-O'Brien Construction Co.
Amber Point Buildings 4,5,&6 Job Site
200 Northpoint Dr
Coppell, TX 75019
Phone (972~t71-1910 Fax: (972)471-1932
Letter of Transmittal
TO: Coppell;City of
ATTN Larry Davis
255 Parkway
Coppell, TX 75019
Phone: (972) 304-3684
Faa: (972) 304-3570
Dom: sni2oos
Job: 05028 ildings 4,5,&6
Transmittal tF: 116
Subject: Badcchedc certifications for AmberPoint Bldg. 4,5,6
Type of Delivery:
WE ARE SENDING YOU ,~ Attached
r Shop drawings r Prints
f' Copy of letter r Change order
r Under separate cover via None the following items:
r Plans r Samples
r specifications t- Omer
Document T Copies Date No. Description
Other 1 917/06 Backcheck certif~catior~ for AmberPoint (200 Northpoint, 82
Sa Lake 875 Sand Lake
THESE ARE TRANSMITTED as checked below:
r For approval f Approved as submitted f Resubmit _ copies for approval
r For your use r Approved as noted i Submit _ copies for distribution
R As requested r Returned for corrections r Return _ corrected prints
r For review and comment r Other
r FOR BIDS DUE r PRINTS RETURNED AFTER LOAN TO US ~,
Remarks:
11
°~
From: Paul Harper (Rogers- O'Brien Construction)
Signature:
Copy To:
~~
~~
tf erxlosures are nd ais noted, Idndty notify us at once. Pape 1 d 1