DR9801-CS 99011901/20/99 WED 09:22 FAX 214 361 5573 ItALFF ASSOC INC ~]002 Summary Offsite Drainage and Paving Improvements On-site Meeting No, 6 January 19, 1999 Halff Associates arrived on site at approximately 10:30 am on January 19 to discuss construction, landscaping, and inspection issues. The meeting began approximately at 10:30 am and concluded at approximately 11:00 am. During this time discussions about construction, landscaping, and inspection issues were held; however, not all attendees were present for all discussions. I. Participants Name Organization Phone Fax~E-mail Todd Jackson Halff Associates 214-346-6246 214-739-0095 Matt Dorsett Halff Associates 214-346-6243 214-739-0095 Roger Dupree Sutton & Assoc. 8 t7-379-5577 II. Issues Discussed Item Action Description 6.1 Wright/Sutton At the 60" RCP site, Wright has completed filling in the trench with a dozer. Wright still needs to place riprap and grade at the headwall to provide for positive drainage to the creek. At the 54" RCP site, Sutton has graded and stabilized the subgrade. Sutton plans to pour the pavement on Tuesday, January ~ 26 and Thursday, January 28. At the box culvert site, Sutton has completed the ~ pavement replacement except for sealing the joints which will be done along with the pavement at the intersection of Freeport Parkway and 1-635. Wright still needs~ to place riprap around both headwalls and grade around both headwalls to provide positive drainage through the system. 6.2 Wright Upon completion of the construction, Wright will grass at the 60" RCP and the 54" RCP sites with winter rye grass. 6.3 Sutton Sutton is to install a traffic-bearing concrete pull box on the 54" RCP site at the location of the existing pull box. Another concrete pull box is to be installed outside the pavement to the south and 3" PVC conduit will connect the two boxes. 6.4 Sutton The color and pattern of the brick pavers to be used at the 54" RCP site shall be the City of Coppell standard, 6.5 Wright Halff Associates will not approve Change Order #3 unless the total is reduced to approximately $2097.00. Additions and corrections to these minutes should be sent to Todd Jackson by phone at (214) 346-6246 or . by fax at (214) 361-5573 within five (5) working days. If no corrections are noted, minutes will be assumed i correct. HALFF ASSOCIATES, INC. Todd Jackson