Coppell Trade 2-CS060830T H E C I T Y O F
COPPELL
August 30, 2006
Dayton C Macatee P E
Macatee Eng;neermg
6440 N Central Fxpwy Suite 414
Dallas, TX 75206
ItE: Coppell Trade Center -Phase 2
Fee Assessment Letter
Dear Mr Macatee
Enclosed rs a copy of the Crty of Coppell Development Fee Assessment table, along wrth a copy of the
Development Fee calculatrons for the referenced development
Please make payment for the Impact. Fees to the Crty of Coppell rn the amount of $28,52].79 and forward
to the I;ng;ncerrng Department along wrth a copy of the Fee Assessment table "I'hrs amount rs a portron of
th, assessed tees that ne.c:d to he pard prror to fil'mg of the final plat Please note that the Tek:as
Legislature under Senate I~rll 243, delayed the collection of Vl%ater and Sewer Impact Fees until the
issuance of a Building Pernut Please prop ide a copy of the Enguieer's estimate or contract to our office
so the 2°io & 4° o construction inspee,tron fee can be ~ erified 1'he construction inspection fees must be
pard prror to the scheduled pre-~onstrucUon meeting
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be pard by
separate check at the new Public Vv'orks Sf:rvice Center, 8l6 S Coppell Road Meters will be ordered
when those fees are pard
,~.ppropnate payment of the rcgwred fees wall help insure a successful beginning of this protect VJe look
t~irward to working with you on this pro.lect If you have any questions please contact me
5rncerely,
1LCith R. Marvin, P 1/
Assistant City 1=.ngn~eer
c~ .lenml~:.r Armstrong, Finance Director
IV9ary Beth Spietzer Administrative Secretary, Building Inspect;ons
Glenn Hollowell, Assistant Director of Public Works
Greg Jones. C hief Building Official
Brad Rerd Director of Parks and Recreation
2 5 °_ F~ R r 41 * P r R ~ ~: _. F * ~ F P E ~ ~_ r x ~ S * r r i ~ 4~ _ ~ .. 2 * F x y~~ 3 n 4 ti 3
P~"VELOPMENT FEE TABI~
Project: Coppell Trade Center -Phase 2
Date: 8/30/2006
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $9,594 00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $100 00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domesttc) $204 34
100% due at Issuance of Water Meter)
Water Meter Fee (Irrtgatton/Ftreltne) $204 34
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domesttc) $30 00
(100% due at Issuance of Water Meter)
Irrtgatton/Firelme Meter Depostt $30 00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $4,797 00
(100% due at Issuance of Butldmg Permtt)
Wastewater Tap Inspectton Fee $50 00
(100% due at Issuance of Building Permit)
Uttlrty Final Inspectton Fee $50 00
(100% due at Issuance of Butldtng Permtt)
Park Fee $0 00 $0 00
(100% due prior to Ftltng Plat)
Roadway Impact Fee $28,521 79 $28,521 79
(100% due prior to Ftltng Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Stgn Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(l00% due rtor to Start of Construction)
TOTAL $43,581 47
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $28,521 79
Dom'/ELOPMENT FEE WORKSHE~"~T
PROJECT: Coppell Trade Censer - Pl:ase 2
DATE: 8/30/2006
Water Impact Fee:
Domestic Meter(s)
Irrigation Meter(s)
Fireline Meter(s)
1 - 2 inch
1 - 2 inch
0
0
Total # 10 66 ESU's @ $900 00 ea
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
= 5 33 ESU's
= 5 33 ESU's
= 0 ESU's
= 0 ESU's
Total # 2 Connections @ $50 00 ea
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total # 1 Domestic Meter(s) @ $204 34
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #~ 1 Irrigation Meter(s) @ $204 34
Total # 0 Additional Irrigation Meter(s) @ $0 00
Total # 0 Fireline Meter(s) @ $0 00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total # 1 Meter(s) @ $30 00 ea
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total # 1 Meter(s) @ $30 00 ea
(100% due prior to Issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's 5 33
(Due prior to issuance of building permit)
@ $900 00 ea
Wastewater Tap Inspection Fee:
Total # 1 Connections @ $50 00 ea
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total # 1 Lots @ $50 00 ea
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
$9,594 00
$100 00
$204 34
$204 34
$0 00
$0 00
$30 00
$30 00
$4,797 00
$50 00
$50 00
Page 1
D~'~ELOPMENT FEE WORKSHF"T
'~ Yreliminar_y plat approved:
0 Single-family @ $0 00 per lot
0 Multi-family @ $0 00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way
This fee cannot be assessed until after T U Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292 60 per light will be assessed
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$0 00
$0 00
$28,521 79
Information not Available
Information not Available
Information not Available
Page 2
ROAp'"VAY IMPACT FEE CALCULA SONS
PROJECT Coppell Trade Center -Phase 2
DATE 8/30/2006
ROADWAY' IMPACT FEE:
Service Area * 1
Cate ory ** Li ht Industrial
Land Use ** General L~ ht Industrial
Buildm Area (sf) 1 17,737
Develo ment Umts * * 1 17 74
Vehicle Miles er Develo ment Unit * * 3.23
Fee er Vehicle Mile *** $150
Roadway Impact Fee due = (Development Units) x
Vehicle Miles er Develo ment Unit x (Fee er Vehicle Mile) _ $57,043 58
* (Figure 4 1 -Roadway Impact Fee Study)
** (Table 4 10 -Roadway Impact Fee Study)
*** (Schedule 2, Page 3 -The Master Fee Schedule)
Percent of Credit Toward Roadway Impact Fees 50%
Total Credit $28,521 79
~11KOtIN7' I~t7L~. $28,5179
**]mpact fee credit based on approved Economic Development incentive package