Loading...
Coppell Trade 2-CS060830T H E C I T Y O F COPPELL August 30, 2006 Dayton C Macatee P E Macatee Eng;neermg 6440 N Central Fxpwy Suite 414 Dallas, TX 75206 ItE: Coppell Trade Center -Phase 2 Fee Assessment Letter Dear Mr Macatee Enclosed rs a copy of the Crty of Coppell Development Fee Assessment table, along wrth a copy of the Development Fee calculatrons for the referenced development Please make payment for the Impact. Fees to the Crty of Coppell rn the amount of $28,52].79 and forward to the I;ng;ncerrng Department along wrth a copy of the Fee Assessment table "I'hrs amount rs a portron of th, assessed tees that ne.c:d to he pard prror to fil'mg of the final plat Please note that the Tek:as Legislature under Senate I~rll 243, delayed the collection of Vl%ater and Sewer Impact Fees until the issuance of a Building Pernut Please prop ide a copy of the Enguieer's estimate or contract to our office so the 2°io & 4° o construction inspee,tron fee can be ~ erified 1'he construction inspection fees must be pard prror to the scheduled pre-~onstrucUon meeting The additional fees for water and sewer taps, water meters, and utility inspection fees need to be pard by separate check at the new Public Vv'orks Sf:rvice Center, 8l6 S Coppell Road Meters will be ordered when those fees are pard ,~.ppropnate payment of the rcgwred fees wall help insure a successful beginning of this protect VJe look t~irward to working with you on this pro.lect If you have any questions please contact me 5rncerely, 1LCith R. Marvin, P 1/ Assistant City 1=.ngn~eer c~ .lenml~:.r Armstrong, Finance Director IV9ary Beth Spietzer Administrative Secretary, Building Inspect;ons Glenn Hollowell, Assistant Director of Public Works Greg Jones. C hief Building Official Brad Rerd Director of Parks and Recreation 2 5 °_ F~ R r 41 * P r R ~ ~: _. F * ~ F P E ~ ~_ r x ~ S * r r i ~ 4~ _ ~ .. 2 * F x y~~ 3 n 4 ti 3 P~"VELOPMENT FEE TABI~ Project: Coppell Trade Center -Phase 2 Date: 8/30/2006 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $9,594 00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $100 00 (100% due at Issuance of Water Meter) Water Meter Fee (Domesttc) $204 34 100% due at Issuance of Water Meter) Water Meter Fee (Irrtgatton/Ftreltne) $204 34 (100% due at Issuance of Water Meter) Water Meter Deposit (Domesttc) $30 00 (100% due at Issuance of Water Meter) Irrtgatton/Firelme Meter Depostt $30 00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,797 00 (100% due at Issuance of Butldmg Permtt) Wastewater Tap Inspectton Fee $50 00 (100% due at Issuance of Building Permit) Uttlrty Final Inspectton Fee $50 00 (100% due at Issuance of Butldtng Permtt) Park Fee $0 00 $0 00 (100% due prior to Ftltng Plat) Roadway Impact Fee $28,521 79 $28,521 79 (100% due prior to Ftltng Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Stgn Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (l00% due rtor to Start of Construction) TOTAL $43,581 47 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $28,521 79 Dom'/ELOPMENT FEE WORKSHE~"~T PROJECT: Coppell Trade Censer - Pl:ase 2 DATE: 8/30/2006 Water Impact Fee: Domestic Meter(s) Irrigation Meter(s) Fireline Meter(s) 1 - 2 inch 1 - 2 inch 0 0 Total # 10 66 ESU's @ $900 00 ea (Due prior to issuance of building permit) Water Tap Inspection Fee: = 5 33 ESU's = 5 33 ESU's = 0 ESU's = 0 ESU's Total # 2 Connections @ $50 00 ea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total # 1 Domestic Meter(s) @ $204 34 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #~ 1 Irrigation Meter(s) @ $204 34 Total # 0 Additional Irrigation Meter(s) @ $0 00 Total # 0 Fireline Meter(s) @ $0 00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total # 1 Meter(s) @ $30 00 ea (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total # 1 Meter(s) @ $30 00 ea (100% due prior to Issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's 5 33 (Due prior to issuance of building permit) @ $900 00 ea Wastewater Tap Inspection Fee: Total # 1 Connections @ $50 00 ea (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total # 1 Lots @ $50 00 ea (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): $9,594 00 $100 00 $204 34 $204 34 $0 00 $0 00 $30 00 $30 00 $4,797 00 $50 00 $50 00 Page 1 D~'~ELOPMENT FEE WORKSHF"T '~ Yreliminar_y plat approved: 0 Single-family @ $0 00 per lot 0 Multi-family @ $0 00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way This fee cannot be assessed until after T U Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292 60 per light will be assessed (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department (2% of development cost required for private improvements) (4% of development cost required for public improvements) $0 00 $0 00 $28,521 79 Information not Available Information not Available Information not Available Page 2 ROAp'"VAY IMPACT FEE CALCULA SONS PROJECT Coppell Trade Center -Phase 2 DATE 8/30/2006 ROADWAY' IMPACT FEE: Service Area * 1 Cate ory ** Li ht Industrial Land Use ** General L~ ht Industrial Buildm Area (sf) 1 17,737 Develo ment Umts * * 1 17 74 Vehicle Miles er Develo ment Unit * * 3.23 Fee er Vehicle Mile *** $150 Roadway Impact Fee due = (Development Units) x Vehicle Miles er Develo ment Unit x (Fee er Vehicle Mile) _ $57,043 58 * (Figure 4 1 -Roadway Impact Fee Study) ** (Table 4 10 -Roadway Impact Fee Study) *** (Schedule 2, Page 3 -The Master Fee Schedule) Percent of Credit Toward Roadway Impact Fees 50% Total Credit $28,521 79 ~11KOtIN7' I~t7L~. $28,5179 **]mpact fee credit based on approved Economic Development incentive package