Loading...
ARK Church-CS060727DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM. Stringfellow Addition, Lot 1, Block B, Replat to allow the construction of a 4,255- square -foot church on approximately 0 6 acres of property located at 517 Sandy Lake at the southwest corner of Holly Street, at the request of Ralph Martinez, RGM Architects. STAFF REP.: Matt Steer PROJECT ID# RP -06 -0036 DRC DATE: July 27, 2006 and August 3, 2006 CONTACT. • Kenneth M. COMMENT STATUS: Tin, P.E., Dir.of Engineering/Public Works 9721304 -3686 ✓PRELIMINARY NNAL REVD AFTER P& 1 2 3 4 5 Utility Plans indicate re -using the existing water /sewer services Are these adequately sized for the new facility? Drainage should be collected on -site and conveyed to the inlet/collection system in Holly Street underground. A permit will be required from the Engineering Dept. for construction of the parking lot and utilities. Impact fees will be assessed based on the capacity of the new facility Fire Hydrant should be located within a 15' utility easement. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM. • S- 1234- SF -12, ARK Church zoning change request from SF -12 (Single Family -12) to S- 1234 -SF -12 (Special Use Permit- 1234 -Single Family -12), to allow the construction of a 4,255- square -foot church on approximately 0 6 acres of property located at 517 Sandy Lake At the southwest corner of Holly Street, at the request of Ralph Martinez, RGM Architects. STAFF REP.: Matt Steer PROJECT ID# SUP -06 -0035 DRC DATE: July 79, 2006 and August 3, 2006 CONTACT: Kenneth M. COMMENT STATUS: P.E.. Dir.ofEnkineerinElPublic Works 9721304 -3686 ✓PRELIMINARY I FIM4:L I RE14&90 No Comments.