Arbor Manors-CS060707
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
PD-214-TH-1, TH-2, TC, C and A, The ElIin2ton, zomng change request
from C (CommercIal), R (Retail) and SF-9 (Smgle FamIly-9) to PD-214-TH-1,
TH-2, Te C and A (Planned Development-214-lownhouse-l, Townhouse-2,
Town Center Commercial and Agnculture, wIth a Concept Site Plan to allow
the development of 133 townhouse umts (62 dwellmg umts on Tract A la, TH-
I on approxImately J 2 acres and 71 dv.elhng umts on Tract A.1 b, TH-2 on
approxlmatel) 8 acre,,), Commercial uses on I ract A 2 (approximately 1 7
acres) along Sand) Lake Road, Town Center uses on Tracts A 3 and AA (4 4
acres) along Denton Tap Road, Agnculture zonmg on 3 3 acres for park/open
space, on a total of approximately 29 05 acre~ of property located south of
Sandy Lake Road. and west of Denton Tap Romi. at the request of Matthew
Alexander, Dowdey Anderson & ASSOCiates, Inc
ST AFF REP.: Gary ~ieb PROJECT ID# PD-06-0026
DRC DA TE: June 29, 2006 (lnd Ju(v 7, 2006
CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686
COMMENT STATUS:
PRELLlfIM1RY
./ FINAL
REVISED
,1FTER P&Z
Landscape Plan
1. The responsibility for maintenance of the enhanced sidewalk shall be of the HOA and
shall be outlined in the HOA documents. Additionally, the sidewalk shall be compliant
with ADA standards.
Zoning Exhibit
1. Show the future Sandy Lake Road layout and driveway across Sandy Lake from the
proposed entry.
2. This subdivision should connect to the existing Tealwood Drive stub-out. This
connection was planned at the time Wynnpage subdivision was approved.
Preliminary Water & Sewer Plan
1. Connect the water system to the existing water stub-out in Tealwood Drive.
2. Please provide a scaleable drawing of one block of front entry units showing all utility
services driveway layout.