Loading...
Arbor Manors-CS060707 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-214-TH-1, TH-2, TC, C and A, The ElIin2ton, zomng change request from C (CommercIal), R (Retail) and SF-9 (Smgle FamIly-9) to PD-214-TH-1, TH-2, Te C and A (Planned Development-214-lownhouse-l, Townhouse-2, Town Center Commercial and Agnculture, wIth a Concept Site Plan to allow the development of 133 townhouse umts (62 dwellmg umts on Tract A la, TH- I on approxImately J 2 acres and 71 dv.elhng umts on Tract A.1 b, TH-2 on approxlmatel) 8 acre,,), Commercial uses on I ract A 2 (approximately 1 7 acres) along Sand) Lake Road, Town Center uses on Tracts A 3 and AA (4 4 acres) along Denton Tap Road, Agnculture zonmg on 3 3 acres for park/open space, on a total of approximately 29 05 acre~ of property located south of Sandy Lake Road. and west of Denton Tap Romi. at the request of Matthew Alexander, Dowdey Anderson & ASSOCiates, Inc ST AFF REP.: Gary ~ieb PROJECT ID# PD-06-0026 DRC DA TE: June 29, 2006 (lnd Ju(v 7, 2006 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: PRELLlfIM1RY ./ FINAL REVISED ,1FTER P&Z Landscape Plan 1. The responsibility for maintenance of the enhanced sidewalk shall be of the HOA and shall be outlined in the HOA documents. Additionally, the sidewalk shall be compliant with ADA standards. Zoning Exhibit 1. Show the future Sandy Lake Road layout and driveway across Sandy Lake from the proposed entry. 2. This subdivision should connect to the existing Tealwood Drive stub-out. This connection was planned at the time Wynnpage subdivision was approved. Preliminary Water & Sewer Plan 1. Connect the water system to the existing water stub-out in Tealwood Drive. 2. Please provide a scaleable drawing of one block of front entry units showing all utility services driveway layout. Additional comments will be generated during platting and final engineering review.