Loading...
Arbor Manors-CS060810 I ~_a~~ Sieb - The Ellington~la~~ed ~~\lE3loErl1E3~t - ... --- ~-----~--_.- Page 1 I ---~_._-_._---~------~- ------_..~ From: To: Date: Subject: John Elias Gary Sieb 8/10/2006 10.33 34 AM The Ellington Planned Development Gary, I received a revised Tree Survey from Dowdy Anderson this week. I was able to run mitigation numbers based on what's being removed (preservation credit) I am still unable to calculate a Landscape Credit without a detailed landscape plan Here's where they're at without a landscape credit: Total Trees on site 24,691"DBH Total Trees Removed. 10,556"DBH Total Trees Preserved on site 14,135"DBH (52%) Preservation Credit 1 0,556 x 52% = 5,489"DBH Basically they are removing 10,556" minus 5,489"(preservation credit) which leaves them short 5,067" 5,067" x $100 = $506,700 00 amount due at this time Thank You John Elias Park Operations Manager City of Coppell cc: Brad Reid