Loading...
St Ann Catholic-CS060830T H E C I T Y O F COFFELL August 30, 2006 Erik M. Hauglie, P E Pacheco Koch Consulting Engineers 8350 North Central Expressway, Suite 1000 Dallas TX 75206 RE St Ann Catholic Parish Dear Mr Hauglie The City of Coppell has received your plan submittal for Construction at the referenced location and has the following comments to offer* I The plan set should include the latest plat for the property 2 This set should also include a utility sheet indicating the fire sprinkling connection location and the FDC connection location 3 On the dimension control plan, it is difficult to read the proposed construction on top of the proposed demolition to the south of the building, please clarify this plan sheet 4 The drainage plan should include a profile for the proposed storm sewer 5 The paving plan indicates lime stabilization of the proposed paving areas If that is your intention, then the plan is fine If you intend to request a variance to the stabilization, you should modify the plans and request the � ariance at this time 6 Please coordinate the installation of the proposed speed bumps in the fire lane with the Fire Marshal Please make the appropriate revisions to the plan set and submit them for review Sincerely, Keith R. Marvin, P E Assistant City Engineer Office Phone (972) 304 -7044 Fax (972) 304 -3570 5 F A R k' N— * p ' 1 F , 1 9 .] 8 * f F F I. ,, I * l E - A —° * I A ,- "n � C, 7 3