Loading...
Belt Line Trade-LR060914 REED EnGinEERinG GEOTECHNICAL AND G R 0 U F" ENVIRONMENTAL CONSULTANTS CONC -CYLINDER TEST REPORT t Line Trade Center Building A 500 E. Belt Line Road Coppell, Texas Desi n Information Source of Concrete Mix Identification ecifjed Stren LMC 1551 4000 Age@ Total Load Date Tested Test Ibs. 09-14-06 7 103300 10-05-06 28 10-05-06 28 Hold H 2 6278 09-14-06 7 92450 6278 10-05-06 28 6278 10-05-06 28 f/~ro 6278 Hold H 3 6279 09-14-06 7 111760 6279 10-05-06 28 6279 10-05-06 28 6279 Hold H 4 6280 09-14-06 7 93730 3320 6280 10-05-06 28 6280 10-05-06 28 6280 Hold H REPORTED TO: IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 A TTN Mr Chris Parnell CONTRACTOR: Raymond Construction Ie Location Firelane. 129'N, 66'W from NE bldg corner Firelane. 100'N, 116'W from NE bldg. corner Firelane 1 05'N, 161'W from N E bldg corner Firelane 100'N, 217'W from NE bldg corner Firelane 100'N, 255'W from NE bldg corner Firelane 110'N, 347'W from NE bldg corner Firelane 100'N, 393'W from NE bldg corner Firelane 100'N, 436'W from NE bid corner Location of Sam Set Number 1 2 3 4 5 6 7 8 REPORT NO. 116 REG PROJECT NO. 13335 SAMPLE DATE: 09-07-06 TECHNICIAN: J Ruiz PAGE: 1 of 2 2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214] 3505600 . FAX [214] 3500019