Belt Line Trade-LR060914
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F"
ENVIRONMENTAL CONSULTANTS
CONC -CYLINDER TEST REPORT
t Line Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
Desi n Information
Source of Concrete Mix Identification ecifjed Stren
LMC 1551 4000
Age@ Total Load
Date Tested Test Ibs.
09-14-06 7 103300
10-05-06 28
10-05-06 28
Hold H
2 6278 09-14-06 7 92450
6278 10-05-06 28
6278 10-05-06 28 f/~ro
6278 Hold H
3 6279 09-14-06 7 111760
6279 10-05-06 28
6279 10-05-06 28
6279 Hold H
4 6280 09-14-06 7 93730 3320
6280 10-05-06 28
6280 10-05-06 28
6280 Hold H
REPORTED TO: IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
A TTN Mr Chris Parnell
CONTRACTOR:
Raymond Construction
Ie
Location
Firelane. 129'N, 66'W from NE bldg corner
Firelane. 100'N, 116'W from NE bldg. corner
Firelane 1 05'N, 161'W from N E bldg corner
Firelane 100'N, 217'W from NE bldg corner
Firelane 100'N, 255'W from NE bldg corner
Firelane 110'N, 347'W from NE bldg corner
Firelane 100'N, 393'W from NE bldg corner
Firelane 100'N, 436'W from NE bid corner
Location of Sam
Set Number
1
2
3
4
5
6
7
8
REPORT NO. 116
REG PROJECT NO. 13335
SAMPLE DATE: 09-07-06
TECHNICIAN: J Ruiz
PAGE: 1 of 2
2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214] 3505600 . FAX [214] 3500019