Loading...
Denton Tap 3A-CS060801(2)August 1, 2006 Ken Head Head Construction Inc 3030 LBJ Frwy, Ste 700 Dallas, TX 75234 Sincerely, Keith Marvin, P E Assistant City Engineer Office Phone (972) 304 -7044 Fax (972) 304 -3570 T H E C 1 T Y 0 F Fax 214/722 -7635 RE: Denton Tap Development /Lot 3, Block A (Coppell Montessori Academy) Final Acceptance Dear Mr Head Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two -year maintenance bonds and as -built drawings have been received from the contractor Maturity on the bonds will be two years from the date of this letter You may notify the MS4 (City of Coppell) at any time during the two -year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow -up inspection of the facilities will be conducted prior to the laps of the two -year bond period If any punchlist items are noted at that time, you will be contacted to make repairs Thanks for your cooperation. cc Ken Griffin, P E Director of Engineering Public Works Glenn Hollowell, P E Asst Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Anwar Arshouk, P E MA Engineering Construction 55 FC. f: L.0.v 9178 _L 1 F'E L L T i 0 1 y TL 'i 4 0 2 EAT 04 36-'