Denton Tap 3A-CS060801(2)August 1, 2006
Ken Head
Head Construction Inc
3030 LBJ Frwy, Ste 700
Dallas, TX 75234
Sincerely,
Keith Marvin, P E
Assistant City Engineer
Office Phone (972) 304 -7044
Fax (972) 304 -3570
T H E C 1 T Y 0 F
Fax 214/722 -7635
RE: Denton Tap Development /Lot 3, Block A (Coppell Montessori Academy)
Final Acceptance
Dear Mr Head
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. The two -year maintenance bonds and as -built
drawings have been received from the contractor Maturity on the bonds will be two
years from the date of this letter
You may notify the MS4 (City of Coppell) at any time during the two -year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow -up inspection of the facilities will be conducted prior to the laps of the two -year
bond period If any punchlist items are noted at that time, you will be contacted to make
repairs Thanks for your cooperation.
cc Ken Griffin, P E Director of Engineering Public Works
Glenn Hollowell, P E Asst Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
Anwar Arshouk, P E MA Engineering Construction