Loading...
Coppell Trade 2-CS060629DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Coupell Trade Center, Lot 1R, Block 1, Renlat, to revise the location of fire lanes and utilities to allow the construction of three office/warehouse buildings, on approximately 40 6 acres of property located along the north side of Sandy Lake Road, between Northpomt Drive (extended) and the extension of Freeport Parkway, at the request of Brian Degravelle, Merriman Associates/Architects. STAFF REP.: Matt Steer PROJECT ID# RP-06-0028 DRC DATE: June 29, 2006 and July 7, 2006 CONTACT.• Kenneth M. COMMENT STATUS: P.E., Dir.ofEn,~ineerinp,/Public Works 972/304-3686 /PRELIMINARY ~ FINAL ~ Iid~~ Preliminary Utility Plan 1. Show the location of the FDC's and the FDC piping. The FDC lines should not be tied into the fire loop. Show the connection of the fire loop to the fire riser rooms for Buildings A and B. 2. The domestic water for Building D should not be tied into the fire loop. Provide a separate meter and line for domestic service. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-208R-LI, Connell Trade Center, zoning change request from PD-208-LI (Planned Development-208-Light Industrial) to PD-208R-LI (Planned Development-208 Revised-Light Industrial) to approve Detail Plans for three office/warehouse buildings (Buildings A and B each containing approximately 150,500 square-feet and Building D containing approximately 117,737 square- feet) on approximately 27 8 acres of property located along the north side of Sandy Lake Road, between Northpoint Drive (extended) and the extension of Freeport Parkway, at the request of Brian Degravelle, Merriman Associates/Architects. STAFF REP.: Matt Steer PROJECT ID# PD-06-0027 DRC DATE: June 29, 2006 and July 7, 2006 CONTACT: Kenneth M. P.E.. Dir Works 972/304-3686 COMMENT STATUS: /PRELIMINARY No Comments.