Loading...
Park West CC(03-2)-CS060824COFFELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To Ken Griffin. P.E., Dir, of Engineering / Public Works Keith Marvin, P.E.. Asst. Cite E:rngineer Glenn HolloNvell, Asst. Dir. of Public Works Lee Stone. Commercial Bldg. Inspector Tim Oates. Fire Marshal From: ✓Lan Davis. Construction Inspector Office Phone: (972) 304 -3684 Fax: (972) 304 -3570 Date: August 24, 2006 RE: RESCHEDULED N ALK- "HRUINSPECTION Park W'est Commerce Center. Lot I R -21 Flock 2. Darryl Flood NVI-I, Phase 2 A final Nialk -thru for utilities on the referenced project has been scheduled for: Tuesday, August 29, 2006 at 9 a.m. Please let me kno�� if I can be of f irthcr ass'stance. ce: David NIcinhardt. Mcinhardt &, Associates Architects Fax: 972/980 -8082 Lance Aaron_ CD I lcmderson lnc. 972!494 -9109 s'd 0 C-- y1-P�' t.�y �O C- ,►�'u�v�iP� ���'1 � ��I E' ltaFVt�sc.i��e . /7 !U Yip f - r C-/' 4- T H E C I T Y O F COFFELL MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING FILE To Ken Griffin, P E , Dir of Engineering / Public Works Keith Marvin, P E , Asst. City Engineer Glenn Hollowell, Asst. Dir of Public Works Lee Stone. Commercial Bldg Inspector Tim Oates, Fire Marshal (Q From Larry Davis, Construction hlspector 7 Office Phone (972) 304 - 3684 00 Fax (972) 304 -3570 Date August 24, 2006 RE RESCHEDULED WALK -THRU INSPECTION Park West Commerce Center, Lot IR -2, Block 2, Darryl Flood WH, Phase 2 A final walk -thru for utilities on the referenced project has been scheduled for: Tuesday, August 29, 2006 at 9 a.m. Please let me know if I can be of further assistance cc David Meinhardt, Meinhardt & Associates Architects Fax 972/980 -8082 Lance Aaron, CD Ilenderson Inc 972/494 -9109 F h e * — F, ,, -,4 * FFFI ,. S * 7 EL. 1 dI _ 4 „ r , 2, * FAX 9'2 3U; 3 5 3