Vista Point 2R-CS060622 (2)
06/22/2006 13:11
9722193487
ENGINEERING
PAGE 132
~
. . ~l'J.
. . .
June '22nd, 2006
Mr. :erne l1auglie. P ,E.
~eco Koch Consulting Engineers
8350 N. Central Expressway, Smte lOOO
Dallas, TX 75206
Re: Vista Point TIt Phase 2 SideWalks
Dear MT. Hauglie:
The plans f9r the sidewalks, along Hwy 121 for Vista Point IT; Phase 2 are accepta,ble.,
Prior to construction of the sidewalks, please contact Jerry Rol;Jerts, City ofLewisvHle
Chief Inspector to set up a pre.c~tnlction meeting. He may be reaebed at (972) 219-
3495. .
xc: 1~ Roberts, Chief Inspector
P,o. Box 299002
lewisvilie. Texas 75029.9002