Loading...
Vista Point 2R-LR060818 REED EnGInEERInG GEOTECHNICAL AND G R Cl U P ENVIRONMENTAL CONSULTANTS POST~NJE TION CONFIRMATION RESULTS Vista Point II, Phase II .H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc. POBox 575 Addison, Texas 75001 A TTN Mr Keith McMahon REPORT NO. 10 REPORT DATE: 08-18-06 REG PROJECT NO. 13581 PAGE: 1 of 1 AREA REPRESENTED: 0-200'N, 0-60'E from S W building corner Building No B' N b IP k t P ~~ orlnc urn er oc e en Date Depth I W~17 I W~18 Sampled (feet) 08-13-06 00-15 40 1 0 15-30 375 1 5 30-45 1 75 25 45-60 2.25 2.5 60-75 35 2.25 75-90 35 20 90-100 1 0 30 Comments Borings obtained after five injection passes Based on the test results, an additional pass is not considered necessary Extra net Distribution: (1) Jackson Shaw Company/ Mr Christopher Gardner (1) AECC, Inc./Mr Chad Stephens Submitted by' REED ENGINEERING GROUP, LTD. Original Signed By Mail Distribution: (1) Bullard Construction, Inc./ Mr Keith McMahon (1) City of Coppell/Mr Keith Marvin Bill Woolwine Sr Manager, CMT BW Irs ~~ I I 2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214J 3505600 . FAX [214] 3500019 REED EnGinEERInG GEOTECHNICAL AND G R Cl U P ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Vista Point II, Phase II ~ S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO: Bullard Construction, Inc POBox 575 Addison, Texas 75001 A TTN Mr Keith McMahon REPORT NO. 9 REPORT DATE: 08-18-06 REG PROJECT NO. 13581 TECHNICIAN: G Tsougarkis PAGE: 1 of 1 CONTRACTOR: Bullard Construction, Inc. On this date a representative of Reed Engineering Group, Ltd observed water injection operations on the referenced project. The injection operations proceeded in accordance with project specifications unless otherwise noted Injection Depth ft 10 Injection Intervals in 12-18 E ui Number of Probes ea 4 ment Length of Probes ft 11 5 Probe Spacing ft 5 Pass No. 4 Surfactant added at regular intervals Yes Extranet Distribution: (1) Jackson Shaw Company! Mr Christopher Gardner (1) AECC, Inc.lMr Chad Stephens Submitted by' REED ENGINEERING GROUP, L TD Original Signed By Mail Distribution: (1) Bullard Construction, Inc.l Mr Keith McMahon (1) City of Coppell!Mr Keith Marvin Bill Woolwine Sr Manager, CMT BW /mg r{I file C7J' -j · (}t. ...... t/ rr-L- 2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214] 350 5600 . fAX [214] 3500019