Vista Point 2R-LR060818
REED EnGInEERInG
GEOTECHNICAL AND G R Cl U P
ENVIRONMENTAL CONSULTANTS
POST~NJE TION CONFIRMATION RESULTS
Vista Point II, Phase II
.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc.
POBox 575
Addison, Texas 75001
A TTN Mr Keith McMahon
REPORT NO. 10
REPORT DATE: 08-18-06
REG PROJECT NO. 13581
PAGE: 1 of 1
AREA REPRESENTED: 0-200'N, 0-60'E from S W building corner
Building No
B' N b IP k t P
~~
orlnc urn er oc e en
Date Depth I W~17 I W~18
Sampled (feet)
08-13-06 00-15 40 1 0
15-30 375 1 5
30-45 1 75 25
45-60 2.25 2.5
60-75 35 2.25
75-90 35 20
90-100 1 0 30
Comments Borings obtained after five injection passes Based on the test results, an additional
pass is not considered necessary
Extra net
Distribution: (1) Jackson Shaw Company/
Mr Christopher Gardner
(1) AECC, Inc./Mr Chad Stephens
Submitted by'
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc./
Mr Keith McMahon
(1) City of Coppell/Mr Keith Marvin
Bill Woolwine
Sr Manager, CMT
BW Irs
~~
I
I
2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214J 3505600 . FAX [214] 3500019
REED EnGinEERInG
GEOTECHNICAL AND G R Cl U P
ENVIRONMENTAL CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
Vista Point II, Phase II ~
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO: Bullard Construction, Inc
POBox 575
Addison, Texas 75001
A TTN Mr Keith McMahon
REPORT NO. 9
REPORT DATE: 08-18-06
REG PROJECT NO. 13581
TECHNICIAN: G Tsougarkis
PAGE: 1 of 1
CONTRACTOR: Bullard Construction, Inc.
On this date a representative of Reed Engineering Group, Ltd observed water injection
operations on the referenced project. The injection operations proceeded in accordance
with project specifications unless otherwise noted
Injection Depth
ft
10
Injection Intervals
in
12-18
E ui
Number of Probes
ea
4
ment
Length of Probes
ft
11 5
Probe Spacing
ft
5
Pass No.
4
Surfactant added at regular intervals Yes
Extranet
Distribution: (1) Jackson Shaw Company!
Mr Christopher Gardner
(1) AECC, Inc.lMr Chad Stephens
Submitted by'
REED ENGINEERING GROUP, L TD
Original Signed By
Mail
Distribution: (1) Bullard Construction, Inc.l
Mr Keith McMahon
(1) City of Coppell!Mr Keith Marvin
Bill Woolwine
Sr Manager, CMT
BW /mg
r{I
file
C7J' -j · (}t.
...... t/ rr-L-
2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214] 350 5600 . fAX [214] 3500019