DR9801-CS 981103 11/06/98 10:35 FAX 214 739 0095 HALFF ASSOCIATES ~002/003 Weekly Progress Report Offsite Drainage and Paving Improvements Progress Report No. 3 Date: November 3, 1998 Time: 10:30 AM Temp: mid 60's Weather: sunny, clear, light wind Contr. Wright Construction Crew: 10 Equip.: 2 small backhoes, large backhoe, bull dozer, sheep's foot roller, 2 front-end loaders Halff Associates arrived on site at approximately 10:30 am on November 3 for construction observation. At the 60" RCP site at Fritz Drive and Freeport Parkway, nothing new has occurred since the October 30 observation. At the 8'x 5' box culvert site, the box has been installed from the downstream end to 60 or 70 feet from Freeport Parkway. Most of the sections that have been installed have also been backfilled with native material and compacted. The small backhoe was excavating at Freeport Parkway around the existing utilities. On the east side of Freeport, telephone conduit, a water line, and a gas line were exposed. The telephone conduit is directly above the water line. On the west side of Freeport, telephone conduits were exposed. The dozer was spreading native backfill over already installed box culvert sections to bring the alignment up to existing ground elevations. Surveyor's equipment was set up on site. Three City workers were attempting to turn off the water through the exposed water line at Freeport Parkway. Time: 4:00 PM Temp: high $0's Weather: Partly cloudy Contr. Wright Construction Crew: 6 Equip.: 2 small backhoes, large backhoe, bull dozer, sheep's foot roller, 2 front-end loaders HalffAssociates arrived on site at approximately 4:00 pm on November 5 for construction observation. At the 60" RCP site at Fritz Drive and Freeport Parkway, nothing new has occurred since the October 30 observation. At the 8'x 5' box culvert ~ site, the box has been installed from the downstream end to the gas line just east of Freeport Parkway. Most of the sections that have been installed have also been backfilled with native material and compacted. The small backhoe was excavating at Freeport .~ .. Parkway around the existing utilities. The water line had akeady been lowered. The 2 bends where the lowered water line connect to the existing water line were exposed. A 11/06/98 10:35 FAX 214 739 0095 HALFF ASSOCIATES ~003/003 ~ concrete truck arrived on site and dumped concrete around these bends. Two crew ~ members were spreading the concrete around the water line with shovels. A sheep's foot roller was compacting native backfill over the sections that have already been placed. '* The traffic control plan is in place and functioning properly, According to Troy, the on- site Forman, the water has been shut offsince Tuesday and will remain offuntil the box ~ has been installed past the lowered water line. Surveyor's equipment was set up on site. .. ?,~:~' ' It has been a pleasure working with you on this project. If you have any comments or .. questions, please contact me by phone at (214) 346-6246 or by fax at (214) 739-0095 Todd Jackson HALFF ASSOCIAIES, INC. cc: Robert McCann, Catellus Development Corporation