Freeport NIP(6)-CS060712July 12, 2006
Jack Evans, P E
Pacheco Koch Consulting Engineers
8350 N Central Expwy Suite 1000
Dallas, TX 75206
RE: Freeport North Addition Parking Addition /Lot 1, Block 1
Construction Plan Review Comments
Dear Sir
The City of Coppell has reviewed the referenced plans and has no comments to offer
Three sets of final construction plans will be required for the City Engineer's stamp and as many
copies as necessary for your contractors' construction operations All contractors and
subcontractors onsite must have a copy of the plans stamped and approved by the City of
Coppell
All fees must be paid prior to release of this project for construction. The City charges a 2%
inspection fee for all private construction outside the building's footprint. This would include
dirt work, paving, storm drain, water lines, sewer lines, drainage pipes, etc that are private For
all installations in public right -of -way, the City of Coppell charges a 4% fee A check for
inspection fees made to City of Coppell should be submitted to this office along with a copy of
the contract(s) with the appropriate 2% and 4% calculations shown for verification purposes. If
you have any questions, please contact me at your convenience.
Sincerely,
Keith R. Marvin, P.E
Assistant City Engineer
Office Phone (972) 304 -7044
Fax (972) 304 -3570