Loading...
Freeport NIP(6)-CS060712July 12, 2006 Jack Evans, P E Pacheco Koch Consulting Engineers 8350 N Central Expwy Suite 1000 Dallas, TX 75206 RE: Freeport North Addition Parking Addition /Lot 1, Block 1 Construction Plan Review Comments Dear Sir The City of Coppell has reviewed the referenced plans and has no comments to offer Three sets of final construction plans will be required for the City Engineer's stamp and as many copies as necessary for your contractors' construction operations All contractors and subcontractors onsite must have a copy of the plans stamped and approved by the City of Coppell All fees must be paid prior to release of this project for construction. The City charges a 2% inspection fee for all private construction outside the building's footprint. This would include dirt work, paving, storm drain, water lines, sewer lines, drainage pipes, etc that are private For all installations in public right -of -way, the City of Coppell charges a 4% fee A check for inspection fees made to City of Coppell should be submitted to this office along with a copy of the contract(s) with the appropriate 2% and 4% calculations shown for verification purposes. If you have any questions, please contact me at your convenience. Sincerely, Keith R. Marvin, P.E Assistant City Engineer Office Phone (972) 304 -7044 Fax (972) 304 -3570 T H E C 1 T Y 0 F COPPELL 2 5 5 PARKWAY P 0 BOX 9 4 7 8 C O P P E L L T X 7 5 0 1 9 TEL 972'462 0 0 2 2 FAX 972/304 3 6 7 3