POST INJECTION CONFIRMATION RESULTS
Vista Point II, Phase y.
S.H 121 at MacArthur B~levard
Coppell, Texas
REPORTED TO. Bullard Construction, Inc
POBox 575
Addison, Texas 75001
A TTN Mr Keith McMahon
REPORT NO. 7
REPORT DATE: 08-09-06
REG PROJECT NO. 13581
PAGE' 1 of 1
Date
Sampled
08-07 -06
5
W-16
1 5
20
20
20
20
25
30
(
Comments Borings obtained after four injection passes Based on the test results, an
additional pass is considered necessary for an area 0-200'N, 0-60'E from
S W corner of Building 6
Extranet
Distribution (1) Jackson Shaw Company/
Mr Christopher Gardner
(1) AECC, Inc /Mr Chad Stephens
Submitted by'
REED ENGINEERING GROUP, LTD.
Original Signed By
Mail
Distribution (1) Bullard Construction, Inc /
Mr Keith McMahon
(1) City of Coppell/Mr Keith Marvin
Bill Woolwine
Sr Manager, CMT
BW Irs