Vista Point 2R-LR060808
REED i EnGinEERInG
GEOTECHNICAL AND I G R Cl U P
ENVIRONMENTAL CONSULTANTS
REPORT OF WATER INJECTION OBSERVATION
Vista Point II, Phase II
S.H. 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO Bullard Construction, Inc
POBox 575
Addison, Texas 75001
A TTN Mr Keith McMahon
REPORT NO 5
REPORT DATE: 08-08-06
REG PROJECT NO. 13581
TECHNICIAN: T Johnson
PAGE 1 of 1
On these dates a representative of Reed Engineering Group, Ltd observed water injection
operations on the referenced proJect. The injection operations proceeded in accordance
with project specifications unless otherwise noted
Injection Depth
ft
10
Specification
Injection Spacing Injection Pressure
ft psi
5 100-200
36-60
E ui
Number of Probes
ea
4
ment
Length of Probes
ft
12
Probe Spacing
ft
5
Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No
07-13-06 Bldg 5 1 2 320 230 1
07-14-06 Bldg 4 11 704 225 1
Bldg 5 13,150 225 1
07-15-06 Bldg 5 9,021 225 1
07-17-06 Bldg 6 4455 200 1
B!dg 4 1 ~ 775 200 1
07-18-06 Bldg 5 7668 215 2
07 -18-06 Bldg 5 27,621 215 1
07-19-06 Bldo 5 32,566 230 2
Surfactant added at regular intervals Yes
Extranet
Distribution (1) Jackson Shaw Company/
Mr Chnstopher Gardner
(1) AECC, Inc /Mr Chad Stephens
Submitted by
REED ENGINEERING GROUP, L TD
Original Signed By
Mail
Distribution (1) Bullard Construction, I nc./
Mr Keith McMahon
(1) City of Coppell/Mr Keith Marvin
Bill Woolwine
Sr Manager, CMT
AE/mg
-<-414 ~T(ITZ ~)p . llllt 4UlI . LI..:-L_'" 1
[~141 _,~ J ~cU:i. , [214 35'1 '11,17
REED I EnGinEERinG
1 _________ _______
GEOTECHNICAL AND I G R Cl U P
ENVIRONMENTAL CONSULTANTS.
REPORT OF WATER INJECTION OBSERVATION
Vista Point II, Phase II
S H 121 at MacArthur Boulevard
Coppell, Texas
REPORTED TO' Bullard Construction, Inc
POBox 575
Addison, Texas 75001
A TTN Mr Keith McMahon
REPORT NO 6
REPORT DATE 08-08-06
REG PROJECT NO 13581
TECHNICIAN G Tsougarakis
PAGE. 1 of 1
On these dates a representative of Reed Engineering Group, Ltd observed water injection
operations on the referenced project The injection operations proceeded in accordance
with project specifications unless otherwise noted
Injection Depth
ft
10
Specification
Injection Spacing Injection Pressure
ft si
5 100-200
12-18
Probe Spacing
ft
2
Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No
07-20-06 Bldg 4 25,000 215 2
07-21-06 Bldg 4, 5 & 6 33.600 130 2
07 -22-06 Bldq 5 12,000 150 2
Surfactant added at regular intervals
Yes
Extranet
Distribution (1) Jackson Shaw Company/
Mr Christopher Gardner
(1) AECC, Inc /Mr Chad Stephens
Submitted by'
REED ENGINEERING GROUP, L TD
Original Signed By
Mail
Distribution (1) Bullard Construction, Inc /
Mr Keith McMahon
(1) City of Coppell/Mr Keith Marvin
Bill Woolwine
Sr Manager, CMT
AE/mg
.<!.44,)-LT,,-[J~. Illf 411, .[_ llf.>
, . II! Ie 41 J U )bllU . I 1214] jSlJ lJUi9