Loading...
Vista Point 2R-LR060808 REED i EnGinEERInG GEOTECHNICAL AND I G R Cl U P ENVIRONMENTAL CONSULTANTS REPORT OF WATER INJECTION OBSERVATION Vista Point II, Phase II S.H. 121 at MacArthur Boulevard Coppell, Texas REPORTED TO Bullard Construction, Inc POBox 575 Addison, Texas 75001 A TTN Mr Keith McMahon REPORT NO 5 REPORT DATE: 08-08-06 REG PROJECT NO. 13581 TECHNICIAN: T Johnson PAGE 1 of 1 On these dates a representative of Reed Engineering Group, Ltd observed water injection operations on the referenced proJect. The injection operations proceeded in accordance with project specifications unless otherwise noted Injection Depth ft 10 Specification Injection Spacing Injection Pressure ft psi 5 100-200 36-60 E ui Number of Probes ea 4 ment Length of Probes ft 12 Probe Spacing ft 5 Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No 07-13-06 Bldg 5 1 2 320 230 1 07-14-06 Bldg 4 11 704 225 1 Bldg 5 13,150 225 1 07-15-06 Bldg 5 9,021 225 1 07-17-06 Bldg 6 4455 200 1 B!dg 4 1 ~ 775 200 1 07-18-06 Bldg 5 7668 215 2 07 -18-06 Bldg 5 27,621 215 1 07-19-06 Bldo 5 32,566 230 2 Surfactant added at regular intervals Yes Extranet Distribution (1) Jackson Shaw Company/ Mr Chnstopher Gardner (1) AECC, Inc /Mr Chad Stephens Submitted by REED ENGINEERING GROUP, L TD Original Signed By Mail Distribution (1) Bullard Construction, I nc./ Mr Keith McMahon (1) City of Coppell/Mr Keith Marvin Bill Woolwine Sr Manager, CMT AE/mg -<-414 ~T(ITZ ~)p . llllt 4UlI . LI..:-L_'" 1 [~141 _,~ J ~cU:i. , [214 35'1 '11,17 REED I EnGinEERinG 1 _________ _______ GEOTECHNICAL AND I G R Cl U P ENVIRONMENTAL CONSULTANTS. REPORT OF WATER INJECTION OBSERVATION Vista Point II, Phase II S H 121 at MacArthur Boulevard Coppell, Texas REPORTED TO' Bullard Construction, Inc POBox 575 Addison, Texas 75001 A TTN Mr Keith McMahon REPORT NO 6 REPORT DATE 08-08-06 REG PROJECT NO 13581 TECHNICIAN G Tsougarakis PAGE. 1 of 1 On these dates a representative of Reed Engineering Group, Ltd observed water injection operations on the referenced project The injection operations proceeded in accordance with project specifications unless otherwise noted Injection Depth ft 10 Specification Injection Spacing Injection Pressure ft si 5 100-200 12-18 Probe Spacing ft 2 Date I Area Injected (sq ft) I Average Pressure (psi) I Pass No 07-20-06 Bldg 4 25,000 215 2 07-21-06 Bldg 4, 5 & 6 33.600 130 2 07 -22-06 Bldq 5 12,000 150 2 Surfactant added at regular intervals Yes Extranet Distribution (1) Jackson Shaw Company/ Mr Christopher Gardner (1) AECC, Inc /Mr Chad Stephens Submitted by' REED ENGINEERING GROUP, L TD Original Signed By Mail Distribution (1) Bullard Construction, Inc / Mr Keith McMahon (1) City of Coppell/Mr Keith Marvin Bill Woolwine Sr Manager, CMT AE/mg .<!.44,)-LT,,-[J~. Illf 411, .[_ llf.> , . II! Ie 41 J U )bllU . I 1214] jSlJ lJUi9