Loading...
TR0301-CN060512 - LAWRENCE ENGINEERING Envi,onmental- Geotechnical- Material Testing May 12, 2006 P06-0510 Ms Suzan Taylor C I P Coordinator City of Coppell 255 Parkway POBox 9478 Coppell, Texas 75019 Phone 972-304-7019 Fax 972-304-3570 RE: Budget Estimate for Construction Materials Testing of MacArthur Drive and Bethel School Road Traffic Signal Installation Project TR03-01 A and TR03-01 B City of Coppell, Texas Dear Ms. Taylor, Lawrence Engineering (LE) is pleased to be selected for the construction materials testing services for the MacArthur Drive and Bethel School Road Traffic Signal Installation project at Coppell, Texas Our scope of services is based on our understanding of the project plans and project specifications In addition to specific information provided, LE has comprised this project fee schedule based on an estimated duration of the construction period and typical construction methodology Therefore, we request that you carefully review the on-site duration and frequency of testing to compare with your estimated construction schedule As you know, our cost is directly dependent upon the time duration and construction methodology utilized Scope of Services LE proposes to provide the following Construction Materials Testing Services for the MacArthur Drive and Bethel School Road Traffic Signal Installation project as required by the construction drawings and project specifications Earthwork - Sidewalk Replacement/Repair LE will provide a soils technician to collect on-site soil samples for proctor compaction tests of different soil types to be used for the sidewalk replacemenUrepair subgrade Soils technician will perform inspection of materials being placed and will utilize a nuclear density gauge to perform in-place density and moisture content test. ~~ MacArthur Drive and Bethel Road Traffic Signal Imp. Ms. Suzan Taylor P06-051O May 12. 2006 LE proposes to perform drilled shaft confirmation for traffic light pole standards LE soils technician will verify drilled shaft diameter and shaft total depth measurements immediately after drilling operations are completed, prior to concrete placement. Concrete Placement Inspection LE will provide a full time concrete technician during concrete placements This includes the concrete pavement and any other miscellaneous concrete placements. The project superintendent will be notified of any discrepancies noted during visual observation Concrete samples will be taken at appropriate intervals as determined by the project specifications Concrete samples will be tested for temperature, entrained air content, slump, and compressive strength Cost Estimate Presented on Table I attached is our cost estimate for this project. LE'S estimates of testing quantities are based upon material estimates obtained from the Project Construction Drawings and assumed accepted industry standards for items not specified We believe that our total cost estimate is realistic for this project; however, this estimate may be increased or decreased depending upon the actual project progress and the conditions encountered during construction These are estimates Consequently, billings only for services rendered will be based primarily upon the unit rates presented in Table I An invoice for services performed during each month will be sent within the first 10 days of the following month Payment for our services will be due within 30 days of receipt of invoice Schedule Lawrence Engineering is prepared to begin work immediately upon notification to proceed from the project representative We are prepared to respond to your needs with due diligence in a timely fashion, as well as establish a level of communication which facilitates progress Acceptance Lawrence Engineering is committed to, and capable of, providing the required materials engineering and testing services that are necessary for timely and professional project performance LE's engineering technicians are either certified by the American Concrete Institute and National Institute for Certification in Engineering Technologies (NICET) or enrolled in certification programs. Lawrence Engineering is regularly inspected by the Cement and Concrete Reference laboratory (CCRL), is accredited by American Association of State Highway and Transportation Official (AASTHO), and is certified by North Central Texas Region Certification Agency as Disadvantage Business Enterprise (DB E) MacArthur Drive and Bethel Road Traffic Signal Imp Ms. Suzan Taylor P06-051O May 12, 2006 We thank you for your consideration of this proposal and look forward to serving your professional needs on this project. If you require further information, please do not hesitate to contact us Sincerely, Lawrence Engineering Lawrence Engineering R4t2R~Q. Rolando Ramirez Project Manager ~o.~ Gary D Dry CMT Manager Table I Construction Materials Testing for MacArthur Blvd. and Bethel School Road Traffic Signal Improvements TR03-01A and TR03-01 B City of Coppel! Lawrence Engineering Proposal No P06-0510 12-May-06 Estimated Unit Estimated Service Description Quantity Units Price Cost Earthwork - Pavina Subarade. Utility Trench Backfill Soils Technician - Portal to Portal ( min. 2 hours per trip) 15 Hours $34 00 $510.00 Standard Proctor Compaction Test 2 Each $135.00 $270.00 Atterberg Limits 2 Each $45.00 $90 00 Material Finer than #200 Sieve 2 Each $40.00 $80 00 Nuclear Field Density Test 9 Each $15.00 $135.00 Trip Charge - Vehicle Usage 5 Each $25.00 $12500 Subtotal $1,21000 Concrete Placement InSDection Concrete Technician - Portal to Portal (min. 2 hours per trip) 15 Hours $34 00 $51000 Compressive Strength Test Cylinders (based on six cylinders per set) 24 Each $14.50 $348 00 Trip Charge - Vehicle Usage 8 Each $25.00 $200.00 Subtotal $1,058.00 Proiect Manaaement Project Manager - General Project Coordination/Report Review 2 Hours $65.00 $130.00 Subtotal $130.00 Estimated Total Cost $2,398.00 NOTES' 1. Overtime and retest confirmation will be invoiced to project General Contractor. (If required) Overtime rates of 1 5 times the regular hourly rate will be charged for hours worked on the project outside the normal working hours of 7'00 am to 5'00 pm., over eight hours per day, excluding travel time to and from the jobsite, Monday through Friday Services performed on Saturday and Sunday will be billed at 1 5 times the regular rate Services performed on recognized holidays will be billed at 2.0 times the regular hourly rate. 2. All laboratory test fees are FOB our laboratory; additional charge for sample pickup may apply 3 Any additional tests will be billed on a hourly rate and charged at the applicable rate, portal to portal 4 Additional test not specified in this proposal will be quoted upon request. I:: - LAWllNCE ENGINHRING Envi,onmenlal- Geotechnical- Mate,ial Testing PROPOSAL ACCEPTANCE AGREEMENT Description of Services Project Name. Project Location LE Proposal #. Construction Materials Testing MacArthur Blvd and Bethel School Road Traffic Signal Improvements Coppell, Texas P06-0510 APPROVAL AND PAYMENT OF CHARGES Fees will be billed to the account of, and invoices will be mailed to: Firm CHv of Cappe11 Attention Kenneth M. Griffin, P.E., Dir. of Engineering Address. 255 Parkway Blvd. City. Cappe11 State TX Telephone q72/104-1~ax: Proposal Accepted By' .- Title. itt, City Manager Date Accepted ? l~~ "1 '/Ob Zip 75019 Qn/104-7041 PAYMENT TERMS Payable in accordance with the attached agreement(s) Invoices for completed work will be issued every month for continuous or extended projects unless otherwise mutually agreed upon in writing PROPERTY OWNER IDENTIFICATION (If other than above) Name Address City. Telephone. State Fax: Zip SPECIAL PROVISIONS: Please note that Lawrence Engineering reserves the right to withhold all reports until such time as Lawrence Engineering receives a signed Proposal Acceptance Agreement or other written authorization referencing this agreement in its entirety This AGREEMENT, together with Lawrence Engineering's Proposal, Unit Fee Schedule and the attached agreement(s), as indicated below, constitutes the entire agreement between the client and Lawrence Engineering and supersedes all prior written or verbal understandings. Cl Professional Services Agreement Cl Agreement for Materials Testing Services