Loading...
Stringfellow 1R-CS060922T H E �C 1 T Y O F COFFELL f e q S t September 22 2006 David King Nationwide Insurance 549 E Sandy Lake Rd Coppell TX 75019 RE Stringfellow Addition (Nationwide Insurance) /Lot 1, Block A Final Acceptance Conditions Dear Mr King Work activity on infrastructure for the referenced project appears to be essentially complete Three items remain prior to preparation of a final acceptance letter for your development. They are as follow- 1 Repair sidewalk damage 2 Provide a maintenance bond from a registered surety for 50% of the contract value of work performed in the public right -of -way and easements for a 2 -year period stated as beginning on the date of final acceptance from the City 3 Provide record drawings of the public improvements from the engineer to be submitted to City of Coppell Engmeenng Dept. If you have any questions, please call me at your earliest convenience Sinc rely, Rick O'Dell Construction Inspector Office Phone 972/ 304 -7090 Fax 972/ 304 -3570 cc Keith R. Marvin, P E , Assistant City Engineer Glenn Hollowell, P.E , Assistant Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal With attachment Record - Drawing Content and Submittal Requirements to James Dewey, Jr, P E JDJR Engineers and Consultants, Inc 2500 Texas Drive, Suite 100 Irving, Texas 75062 2.5 5 PA R K A oY * P 0 E30 X 947 8 * C 0 P P E L L T} SO 1 9 * T F L 13 2,4 6 — 22 * FAX 9-2 3C'4 3673