Loading...
Belt Line Trade-LR060916 REED EnGinEERinG GEOTECHNICAL AND G R 0 U F" ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Belt Line Trade Center Building A 500 E. Belt Line Road Coppell, Texas REPORTED TO: IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 A TTN Mr Chris Parnell REPORT NO. 118 REG PROJECT NO. 13335 SAMPLE DATE: 09-09-06 TECHNICIAN: T Miller PAGE: 1 of 2 CONTRACTOR: Raymond Construction Location of Sam Set Number 1 2 3 4 Ie Location Paving: 95'N, 420'E from NW bldg corner Paving' 130'N, 490'E from NW bldg. corner Paving 110'N, 580'E from NW bldg. corner Pavin 125'N, 695'E from NW bid corner Desi n Information Source of Concrete Mix Identification S ecified Stren LMC 1551 4000 Age@ Total Load Date Tested Test Ibs. 09-16-06 7 97390 10-07-06 28 10-07 -06 28 Hold H 2 6358 09-16-06 7 93300 3300 6358 10-07-06 28 6358 10-07 -06 28 6358 Hold H 3 6359 09-16-06 7 90000 3180 6359 10-07 -06 28 6359 10-07 -06 28 6359 Hold H 4 6360 09-16-06 7 89810 3180 6360 10-07 -06 28 6360 10-07 -06 28 6360 Hold H 2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEl [214J 3505600 . FAX [214] 3500019 REPORT NO. 118 REG PROJECT NO 13335 SAMPLE DATE. 09-09-06 PAGE: 2 of 2 Submitted by' Mail Distribution: (1) IDIIMr Chris Parnell (1) Raymond Construction/ Mr David Layne (1) City of Coppell/Mr Larry Davis (1) City of Coppell/Mr Lee Stone Air Entrainment 60 55 55 50 Ticket Number 7170438 7170445 6288479 3220277 REED ENGINEERING GROUP, LTD. Original Signed By Mickey Lawson Assistant Manager, CMT MUlnc