Belt Line Trade-LR060916
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F"
ENVIRONMENTAL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Belt Line Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
REPORTED TO: IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
A TTN Mr Chris Parnell
REPORT NO. 118
REG PROJECT NO. 13335
SAMPLE DATE: 09-09-06
TECHNICIAN: T Miller
PAGE: 1 of 2
CONTRACTOR: Raymond Construction
Location of Sam
Set Number
1
2
3
4
Ie
Location
Paving: 95'N, 420'E from NW bldg corner
Paving' 130'N, 490'E from NW bldg. corner
Paving 110'N, 580'E from NW bldg. corner
Pavin 125'N, 695'E from NW bid corner
Desi n Information
Source of Concrete Mix Identification S ecified Stren
LMC 1551 4000
Age@ Total Load
Date Tested Test Ibs.
09-16-06 7 97390
10-07-06 28
10-07 -06 28
Hold H
2 6358 09-16-06 7 93300 3300
6358 10-07-06 28
6358 10-07 -06 28
6358 Hold H
3 6359 09-16-06 7 90000 3180
6359 10-07 -06 28
6359 10-07 -06 28
6359 Hold H
4 6360 09-16-06 7 89810 3180
6360 10-07 -06 28
6360 10-07 -06 28
6360 Hold H
2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEl [214J 3505600 . FAX [214] 3500019
REPORT NO. 118
REG PROJECT NO 13335
SAMPLE DATE. 09-09-06
PAGE: 2 of 2
Submitted by'
Mail
Distribution: (1) IDIIMr Chris Parnell
(1) Raymond Construction/
Mr David Layne
(1) City of Coppell/Mr Larry Davis
(1) City of Coppell/Mr Lee Stone
Air
Entrainment
60
55
55
50
Ticket
Number
7170438
7170445
6288479
3220277
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
MUlnc