Loading...
Northlake 635(7)-CS060614 (2)T H E C I T Y O F COPPELL June 14, 2006 Mr Brian Degravelle Merriman Associates 300 N Field Street Dallas, TX 75202 RE CASE. Northlake 635 Business Park, Lot 2R, Block B, Replat Dear Mr gravelle This letter is to inform you that Northlake 635 Business Park, Lot 2R, Block B, (PSINet, Lot 1, Block A), Site Plan Amendment, to allow a two - story, 27,200- square -foot addition (13,600- square feet per floor) to the existing Crestside Facilities building on 6 527 acres of property located at 1333 Crestside Drive was approved by the Coppell City Council (7 -0) on Tuesday, June 13 2006, subject to the following condition 1) Comply with the Engineering comments (attached) This Replat must be submitted for signatures by City Officials within six months after approval by the City Council (December 13, 2006), or it shall be deemed null and void and resubmittal shall be required. It is recommended that this plat not be prepared for filing, including obtaining the franchise utility signatures, until after receiving Engineering comments on the first review of the civil plans. After City signatures have been procured, it is the applicant's responsibility to file the document with the Dallas County Plat Records Department. Please see the attached Procedure for the Filing of Executed Final Plats and Replats If you have any questions, please contact the Planning Department at (972) 304 -3678 5 ely, ieb, A.I.C.P erect of Planning Brandon O'Donald Bill Homrighausen Building Inspection file 255 PARKWAY * PO BOX 9478 * COPPELL TX 75019 * TEL 972,462 0022 * FAX 972/304 3673 T H E C I T Y O F COPPELL 9 8 A 5 t 8 May 19, 2006 Mr Brian Degravelle Merriman Associates 300 N Field Street Dallas, TX 75202 RE CASE North Lake 635 Business Park, Lot 2R, Block B, Replat Dear Mr Degravelle This letter is to inform you that Northlake 635 Business Park, Lot 2R, Block B, (PSINet, Lot 1, Block A), Site Plan Amendment, to allow a two - story, 27,200 - square -foot addition (13,600- square feet per floor) to the existing Crestside Facilities building on 6 527 acres of property located at 1333 Crestside Drive was recommended for approval by the Coppell Planning and Zoning Commission on Thursday, May 18, 2006, subject to the following conditions 1) Remove the notary signature block located below the City Secretary signature block. 2) Comply with the attached Engineering comment sheet. The date scheduled for consideration by the Coppell City Council is Tuesday, June 13, 2006, at 7 p.m. A representative for this case must be present at this meeting, which will be held in Council Chambers at City Hall Failure to represent this item may result in the denial of this application. City Council has instructed staff to include in its agenda packets only those items that accurately reflect conditions as recommended by the Planning and Zoning Commission. Therefore, please submit to the Planning Department two (2) folded copies of all revised plans, reflecting the above - mentioned conditions, on or before 12 noon, Wednesday, May 31, 2006 Also, please submit one (1) 8 '/z x 11 paper reduction, along with one Mpg, tiff, pdf or similar electronic file If you have any questions, please contact the Planning Department at (972) 304 -3678 Sincerely, � LSD Matt Steer, AICP City Planner c Brandon O'Donald Bill Homrighausen Building Inspection file R KWAY J 55 PARKWAY * P 0 BOX 9478 * COPPE LL TX 75019 * TEL 9721462 0022 * FAX 972,304 3673 COPPELL r o Project ID RP -06 -0018 Address 1333 Crestside Dr CITY OF COPPELL 2nd DRC REPORT Project Name T M H C I T Y O F COPPELL r r o Northlake 635 Business Park Lot 2. Block B Project Type Replat Application Date 4/20/2006 Case Manacle r Matt Steer Project Description To relocate the fire lane to accommodate the two -story, 27,200- square -foot addition (13,600- square feet per floor) to the existing Crestside Facilities building 1 of 1 Agenc Comments Engineering 1 Water lines 10" in diameter and smaller shall be Class 200, DR -14 Please modify the utility notes accordingly 2 Construction plans should be submitted for review and construction permit should be applied for through the Engineering Department. Additional comments may be generated upon detailed engineering review