Loading...
Coppell/121 Off Pk-CS060717_~~ I ~~li-=ilt_t .]ul 17 2006 10:18F1M Baird, Hampton %26 Brown 8172518810 o Q e ~ Q Baird, Hampton & Brown, Inc. Engineering & Surveying July 17, 2006 Mr. Keith Marvin, P.E via fax 972-304-3570 Engineering Department City of Coppell 255 Parkway Coppell, TX 75019 Tel 972-304-7044, Fax 9T2-304-3570 ,.~-i RE, OlaLit?EV~SION _ ~ ~ r_ Coppell/ 121 Office Park - Mr Marnn _-_ _ ---.__ _ As you know, we've been informed that discussions between the Contractor {Fast-Trak Construction) and the City's Inspector have resulted in iden#ifying a cast savings attemative in constructing the small parking Jet addition Specifically, we understand that the lime stabilized subgrade may be replaced with compacted subgrade provided that the reinforced concrete pavement thickness is increased by 1-inch, We understand that our July 14`h letter, proposing the compressive strength of the reinforced concrete be increased from 3,600 to 4,000 PS1, in-lieu of increasing the pavement thickness, is not acceptable. Therefore, and per our telephone conversation, the revised pavement section will consist of 7-inch reinforced concrete pavement over a compacted subgrade. Thank you, BHB Engineering 8 Surveying Kons tine a E. Vice President CC Tom Wouters - RCC via fax 817-424-244$ Drew Sibley -Fast-Trak via fax 214-638-0528 e~~2006.000.00012008.028 0011docslpavement sect,on revisi~n.do:. ~^ 4~/ ~~-- ~~~ ~.. zf_ --~ % - -~/ / ~~ p.l 920 Soulh Main Sheet, Os'd Main Place Suite 19D, Grapevine, Texas 76051, vmw bhbinc.ccm Main 817-338-1277, Office: 817-251-8550, Fax: 817-251-8810, Emai!• mail@bhbinc.com