Loading...
Coppell/121 Off Pk-CS060714=~1 ~'~1;==;1~=i Jul 14 2006 10:38AM Baird, Hampton a Hrown 8172518810 p.l t~ ~ U Baird, Hampton & Brown, Inc. o 0 t'~ Engineering & Surveying July 14, Zoos Mr. Keith Marvin, P.E. via fax 972-304-3570 Engineering Department City of Coppell 255 Parkway Coppell, TX 75019 Te1972-304-7044, Fax 972-304-3570 _ / - ~-- --- /~ j -~. R~ PAVEMENT SECTION REVISION Coppell! 129 Office Park Mr Marvin: We've just been informed that discussions between the Contractor {Fast-Trak Construction) and the City's Inspector have resulted in identifying a cost savings alternative in constructing the small parking lot addition Specifically, we understand that the lime stabilized subgrade may be replaced with compacted subgrade provided that the compressive strength of the reinforced concrete is increased from 3,600 to 4,x00 PSI If this is correct and acceptable to the City of Goppefl, the Gontractor will proceed accordingly Thank you, BHB Engineering & Surveying Kons ntine i3 , Vice President CC Tom Wouters - RCC via fax 817-424-2448 Drew Sibley -Fast-Trak via fax 214-638-0528 e:~2008.000.000t20p6.028.001ki4GS\pavsment 52cton revision.doc 920 South Main Street, Old Main Place Suite 190, Grapevine, Texas 76051, www.bhbinc.com Pain 817-338-1277, Office 617-251-8554 Fax: 817-251-881a Email: maii~bhbinc.oom