Loading...
DR9801-CS 980915 //~7/~ The City With A Beautiful FutUre September 15, 1998 Lemoine Wright, President ~ co[(,.' ~ . 601 West Wall Street Grapevine, TX 76051 Fax: 817481-2369 Southwestern Drive & Freeport Parkway (from Fritz Rd. to Grapevine Creek) Dear Mr. Wright: A preconstruction conference on the referenced project has been sched¢led for Tuesday, September 22, 1998 at 2:00 p.m., in the second floor conference room at Town Center, 255 Parkway Blvd. Construction fees will have to be paid prior to the pre-construction meeting. Please notify the franchised utility companies, contractors, sub-contractors, te~ting lab and any other interested parties so that they may have a representative present. If you should have any questions concerning this project, please feel free to call,me at (972)304- 3684. Sincerely, / Construction Inspector cc: Pat Acker, P.E., Halff Associates, Inc., Fax: 214-739-0095 Mike Martin, P.E. Asst. City Engineer Glenn Hollowell, P.E., Asst. Dh:. of Public Works Greg Jones, Chief Building Official Jim Ragsdlll, Purchasing ~eng filedldavis/freepot, pre / Coppell. Texas 75019 (~//'/~/--'--~ The City V~ith A Beautiful Future 972-462-0022 September 15, 1998 Lemoine Wright, President Wright Construction Co., Inc. 601 West Wall Street Grapevine, TX 76051 Fax: 817-481-2369 RE: Drainage/Paving Improvements '~ ~- a{ ~_/~3 [ /~x~ ~. la~/ /~ ['.~_~ Southwestern Drive & Freeport Parlcway (from Fritz Rd. to Grape'~ine Creek) Dear Mr. Wright: A preconstruction conference on the referenced project has been scheduled for Tuesday, September 22, 1998 at 2:00 p.m., in the second floor conference room at Town Center, 255 Parlc~'ay Blvd. Construction fees will have to be paid prior to the pre-construction meeting. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that the)' may have a representative present. If you should have any questions concerning this project, please feel free to call me at (972)304- 3684. Sincerely, / Larry Davis Construction Inspector cc: Pat Acker, P.E., Halff Associates, Inc., Fax: 214-739-0095 Mike Martin, P.E. Asst. City Engineer Glenn Hollowell, P.E., Asst. Dir. of Public Works Greg Jones, Chief Building Official Jt~ Ragsd:l.].]., Purchasing Agent fileAdavis/fr eel~ot, pre