Loading...
Vista Point 2R-CS060927 I Keith Marvin - Vista_ Point South, Phase II Page 1 I From: To: Date: Subject: "Steven Heilbrun" <sheilbrun@pkce com> <kmarvin@cLcoppell.tx.us> 'j 9/27/200611 1704 AM C I ~ Vista Point South, Phase II --- r Good Morning Keith, <?xml:namespace prefix = 0 ns = "urn.schemas-microsoft-com office. office" I> Regarding the differences between the seals on the plans for Vista Point South, Phase II, the original signed and sealed drawings that were submitted for the city's approval stamp were dated July 14, 2006 After this initial submittal, revisions were made to the Grading and Drainage Plan, Water & Sanitary Sewer Plan, Storm Sewer Plan, and Storm Sewer Profiles. During the revision process, there were technical difficulties with our software which required a file restoration from a previous date. This date was June 26, 2006 All of the plans were updated to show the correct design, however, the date under the seal was inadvertently left as June 26,2006, instead of reading July 14, 2006 Due to this glitch, all of the revisions that were issued to the city for the city's approval stamp read a date of June 26, 2006 These plans showing the date of June 26, 2006 are revised, correct, and up-to-date plans, of which the contractor should have a copy Please find below a list of the current plan sheets: C2.1 Existing Drainage Area Map Signed & Sealed 0714/2006 Signed & Sealed 07/14/2006 C1 1 Dimensional Control C2.2 Proposed Drainage Area Map Signed & Sealed 07/14/2006 C3 1.A Grading & Drainage Plan - Opt. A Signed & Sealed 06/26/2006 wi Delta #1 (09/11/06) Modified Grading C3.1 B Grading & Drainage Plan - Opt. B Signed & Sealed 06/2612006 wi Delta #1 (09/11/06) Modified Grading C4 1 Overall Utility Exhibit No Seal C4.2 Water & Sanitary Sewer Plan Signed & Sealed 06/2612006 wi Delta #1 (08/31/06) Added utility Call-outs; Modified Line SS-2 C43 Sanitary Sewer Profiles Signed & Sealed 07/14/2006 C51 Storm Sewer Plan Signed & Sealed 06/26/2006 wi Delta #1 (09/11/06) Modified Line ST-7 & Added Line ST-11 C5.2 Storm Sewer Profiles Signed & Sealed 07/1412006 C53 Storm Sewer Profiles Signed & Sealed 06/26/2006 wi Delta #1 (09/11/06) Added profile for ST -11 C61 Paving Plan Signed & Sealed 0711412006 C71 Erosion Control Signed & Sealed 07/14/2006 [ Keith Marvin - Vista Point South, Phase II C8 1 Details I apologize for any confusion this may have caused. Thanks, Steven Heilbrun Project Engineer sheilbrun@pkce.com <mailto sheilbrun@pkce.com> Pacheco Koch Consulting Engineers 8350 N Central Expwy, Suite 1000 Dallas, Texas 75206-1612 T 972.235 3031 * F 972.235 9544 www pkce.com <http.llwwwpkce.com/> Page 2 I Signed & Sealed 07/14/2006