Gateway BP(1.4)-CS060929
THE
C I T Y
o F
COPPELL
~~~~.&,:()~
;-~ -..... q
X A .s \ 'D
Mark McGraw, P .E.
Halff & AssOcIates
8616 Northwest Plaza Dnve
Dallas, TX 75225
September 29,2006
RE: Gateway Business Park, Lot lR Block 2
Haverty's Parking Expansion
ConstructIOn Plan ReVIew Comments
Dear Mr McGraw'
The CIty of Coppell has revIewed the plans for the referenced project. These plans meet our
current mInImUm constructIOn reqUIrements WIth the exceptIOn of the followmg comments
1 Include m the constructIOn plan set a copy of the latest filed plat for Lot 1R Block 2
2 ProvIde a letter requestmg a vanance to our pavement sectIon standard. Please mclude a
geotechnIcal report summary to substantiate the request for vanance
3 ClarIfy the extent of the proposed removal and reconstructIOn of the storm sewer
Once these changes have been made, please submIt three sets of revIsed final constructIOn plans
for the CIty Engmeer's stamp and as many copIes as necessary for your contractors' constructIOn
operatIOns. All contractors and subcontractors onsIte must have a copy of the plans stamped and
approved by the CIty of Coppell
All fees must be paId pnor to release of thIS project for constructIOn. The CIty charges a 2%
mspectIOn fee for all pnvate constructIOn outsIde the bUIldmg's footpnnt. ThIS would mclude
dIrt work, pavmg, storm dram, water lmes, sewer hnes, dramage pIpes, etc that are pnvate For
all mstallatIOns m pubhc nght-of-way, the CIty of Coppell charges a 4% fee A check for
mspectIOn fees made to CIty of Coppell should be submItted to thIS office along WIth a copy of
the contract(s) WIth the appropnate 2% and 4% calculatIons shown for venficatIOn purposes. If
you have any questIOns, please contact me at your convemence
Smcerely,
~~
KeIth R. Marvm, P.E
ASSIstant CIty Engmeer
Office 972-304-7044
Fax 972-304-3570
kmarvm@cI.coppelJ.tx.us
Attachment
255 PARKWAY * POBOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673