Loading...
BEI Properties-CS060628T H E C I T Y O F COPPELL ,tune 28, 2006 Gus San Roman Cooper General Contractors 1225 E Crosby, S A 1 Carrollton TX 75006 RE BEI Propernes, Bloom Embro Final Acceptance Dear Mr San Roman FILE Representatives of the City of Coppell have confirmed a final inspection of paving and utihries for the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contractor Maturity on the bonds will be two years from the date of this letter you may notify the MS4 (Gty of Coppell) at any tmle during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so complete and submit a 'notice of I'erm>nation (NOT) to discontinue coverage under the SVa'PPP permit. ~ follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond period. If any punchlist items are noted at that lime, you will be contacted to make repairs. Thanks for your cooperation. Smcerel~. ~~ ~~/ ~ :~.~t~~% Rick O'Dell C'onstruct~on Inspector Office Phone (972) 304-7090 Fax 072) 304-3570 c,c Ken Griffin, P E _ Director of Engineering & Public Works Glenn Hollowell, P.E ,Asst. Director of Public Works Greg Tones, Chief Bu>ldmg Official Tim Oates, Fire Marshal ~~~ __ Keith Marvin, P E assistant City Engineer f ~ ~ * P ~ , ~.~E * i F F F L. , 5 , ~ . ~ ~ ,~ 2 ~,J« * FAX _„ Z 304 3673