BEI Properties-CS060628T H E C I T Y O F
COPPELL
,tune 28, 2006
Gus San Roman
Cooper General Contractors
1225 E Crosby, S A 1
Carrollton TX 75006
RE BEI Propernes, Bloom Embro
Final Acceptance
Dear Mr San Roman
FILE
Representatives of the City of Coppell have confirmed a final inspection of paving and utihries for
the referenced project. The two-year maintenance bonds and as-built drawings have been received
from the contractor Maturity on the bonds will be two years from the date of this letter
you may notify the MS4 (Gty of Coppell) at any tmle during the two-year maintenance period if
stabilization of the site per the SWPPP permit can be demonstrated. If so complete and submit a
'notice of I'erm>nation (NOT) to discontinue coverage under the SVa'PPP permit.
~ follow-up inspection of the facilities will be conducted prior to the lapse of the two-year bond
period. If any punchlist items are noted at that lime, you will be contacted to make repairs. Thanks
for your cooperation.
Smcerel~.
~~
~~/ ~
:~.~t~~%
Rick O'Dell
C'onstruct~on Inspector
Office Phone (972) 304-7090
Fax 072) 304-3570
c,c Ken Griffin, P E _ Director of Engineering & Public Works
Glenn Hollowell, P.E ,Asst. Director of Public Works
Greg Tones, Chief Bu>ldmg Official
Tim Oates, Fire Marshal
~~~ __
Keith Marvin, P E
assistant City Engineer
f ~ ~ * P ~ , ~.~E * i F F F L. , 5 , ~ . ~ ~ ,~ 2 ~,J« * FAX _„ Z 304 3673