Loading...
Belt Line Trade-LR060919 HIe, REP-ORT OF FIELD DENSITY TESTS ~t Line Trade Center Building A /' 500 E Belt Line Road Coppell, Texas REED EnGinEERinG GEOTECHNICAL~ G R 0 UP ENVIRONMENTAL CONSULTANTS '?'Z'~ REPORTED TO' IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 A TTN Mr Chris Parnell REPORT NO 120 REPORT DATE: 09-19-06 REG PROJECT NO 13335 TECHNICIAN L Johnson PAGE' 1 of 1 CONTRACTOR Raymond Construction Proctor ASTM Optimum No Standard Description Moisture, % 1 0-698 Dark red & gray clay 186 2 0-698 Orange & gray sandy clay 164 3 0-698 Tan & gray sandy clay 109 4 0-698 Dark brown & gray clay 206 5 0-698 Light brown & gray clay w/calcareous 21 2 nodules 6 0-698 Red brown & gray shaley clay (lime-treated) 189 101 1 7 0-698 Yellowish brown cia lime-treated 200 1028 Depth Below Field Field Test Final S G Density Moisture Proctor Compaction No Date Location feet pc % ID Level % 517 08-31-06 Fire Lane 95'8, 175'W(1) 00 985 21 7 6 974 518 Fire Lane 195'8 75'W(1) 00 977 221 6 966 519 Fire Lane 200'8, 15'W( 1) 00 979 235 7 960 520 Fire Lane 300'S, 90'W 1 00 987 222 7 968 Comments Where tested, materials were in compliance with project specifications Footnote (1) Measurements referenced from N W building corner Mail Distribution (1) IDI/Mr Chris Parnell (1) Raymond Construction/ Mr DaVid Layne (1) City of Coppell/Mr Larry Davis (1) City of Coppell/Mr Lee Stone Submitted by' REED ENGINEERING GROUP, LTD. Original Signed By Bill Woolwine Sr Manager, CMT BW/mg ,1 4 11~Z c,p. Ill= 41'" . UAlLA Ix TSL I' . Ii [,1141 <":i 560'1 . I' [,114] 350 l'Oi~ REEDI EnGinEERinG _______1_ GEOTECHNICAL AND i G R 0 U P ENVIRONMENTAL CONSULTANTS I REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Belt Line Trade Center Building A 500 E. Belt Line Road Cappel!, Texas REPORTED TO. IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 A TTN Mr Chris Parnell REPORT NO. 122 REPORT DATE 09-19-06 REG PROJECT NO. 13335 DATE OBSERVED. 09-07-06 TECHNICIAN: R. Ruiz P AG E 1 of 1 CONTRACTOR Raymond Construction I Items Observed. I Fire Lane 530'W, 175'N from the N E corner of Building A I Reference Plans or Notes Used' I Civil Sheet 6 of 17 x IThere were no deviations noted The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents Mail Distribution (1) IDI/Mr Chris Parnell (1 ) Raymond Construction/ Mr David Layne (1) City of Coppell/Mr Larry Davis (1 ) City of Coppell/Mr Lee Stone Submitted by' REED ENGINEERING GROUP, LTD Original Signed By Ronald FReed, P E BW /mg eLl ~TIIL -.Jp . IIITE 4 II . 1'~IIH Ix C . I I [' I 4] S I 56 u' . I [2 I 4 I 3 ~ (1 III I I ~ REED EnGinEERinG GEOTECHNICAL AND G R 0 U F" ENVIRONMENTAL CONSULTANTS REPORT OF FIELD GRADATION TESTS Belt tine Trade Center Building A 500 E. Belt Line Road Coppell, Texas .- REPORTED TO IDI 5420 LBJ Freeway, Suite 1275 Dallas, Texas 75240 A TTN Mr Chris Parnell REPORT NO 119 REPORT DATE: 09-19-06 REG PROJECT NO 13335 TECHNICIAN L Johnson PAGE. 1 of 1 CONTRACTOR Raymond Construction Sieve Size 1-3/4" Percent Passin 85 Date 08-30-06 I Location Fire Lane 400'S, 20'E(1) Fire Lane 300'S, 25'E(1) Fire Lane 200'S, 35'E(1) Fire Lane 100'S, 25'E(1) Fire Lane 2'S, 30'E(1) I Passing I 1-3/4" Sieve 100 100 100 100 100 Passing 3/4" Sieve 99 99 98 98 97 Footnote (1) Measurements referenced from N E building corner Mail Distribution (1) IDI/Mr Chris Parnell (1) Raymond Construction/ Mr David Layne (1) City of Coppell/Mr Larry Davis (1) City of Coppell/Mr Lee Stone Submitted by' REED ENGINEERING GROUP, L TD Original Signed By . if hf '/J'l'~~ Bill Woolwine Sr Manager, CMT BW /mg 24"4 ~iUL [Ik . l'llt 411'1 . LJA_L~ l' ' '0. EL IL 4] :511 56011 . I [214] 35LJ LJuI9