Belt Line Trade-LR060919
HIe,
REP-ORT OF FIELD DENSITY TESTS
~t Line Trade Center Building A
/' 500 E Belt Line Road
Coppell, Texas
REED EnGinEERinG
GEOTECHNICAL~ G R 0 UP
ENVIRONMENTAL CONSULTANTS
'?'Z'~
REPORTED TO' IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
A TTN Mr Chris Parnell
REPORT NO 120
REPORT DATE: 09-19-06
REG PROJECT NO 13335
TECHNICIAN L Johnson
PAGE' 1 of 1
CONTRACTOR Raymond Construction
Proctor ASTM Optimum
No Standard Description Moisture, %
1 0-698 Dark red & gray clay 186
2 0-698 Orange & gray sandy clay 164
3 0-698 Tan & gray sandy clay 109
4 0-698 Dark brown & gray clay 206
5 0-698 Light brown & gray clay w/calcareous 21 2
nodules
6 0-698 Red brown & gray shaley clay (lime-treated) 189 101 1
7 0-698 Yellowish brown cia lime-treated 200 1028
Depth
Below Field Field
Test Final S G Density Moisture Proctor Compaction
No Date Location feet pc % ID Level %
517 08-31-06 Fire Lane 95'8, 175'W(1) 00 985 21 7 6 974
518 Fire Lane 195'8 75'W(1) 00 977 221 6 966
519 Fire Lane 200'8, 15'W( 1) 00 979 235 7 960
520 Fire Lane 300'S, 90'W 1 00 987 222 7 968
Comments Where tested, materials were in compliance with project specifications
Footnote (1) Measurements referenced from N W building corner
Mail
Distribution (1) IDI/Mr Chris Parnell
(1) Raymond Construction/
Mr DaVid Layne
(1) City of Coppell/Mr Larry Davis
(1) City of Coppell/Mr Lee Stone
Submitted by'
REED ENGINEERING GROUP, LTD.
Original Signed By
Bill Woolwine
Sr Manager, CMT
BW/mg
,1 4 11~Z c,p. Ill= 41'" . UAlLA Ix TSL I' . Ii [,1141 <":i 560'1 . I' [,114] 350 l'Oi~
REEDI EnGinEERinG
_______1_
GEOTECHNICAL AND i G R 0 U P
ENVIRONMENTAL CONSULTANTS I
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Belt Line Trade Center Building A
500 E. Belt Line Road
Cappel!, Texas
REPORTED TO. IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
A TTN Mr Chris Parnell
REPORT NO. 122
REPORT DATE 09-19-06
REG PROJECT NO. 13335
DATE OBSERVED. 09-07-06
TECHNICIAN: R. Ruiz
P AG E 1 of 1
CONTRACTOR Raymond Construction
I Items Observed.
I Fire Lane 530'W, 175'N from the N E corner of Building
A
I Reference Plans or Notes Used' I Civil Sheet 6 of 17
x IThere were no deviations noted
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents
Mail
Distribution (1) IDI/Mr Chris Parnell
(1 ) Raymond Construction/
Mr David Layne
(1) City of Coppell/Mr Larry Davis
(1 ) City of Coppell/Mr Lee Stone
Submitted by'
REED ENGINEERING GROUP, LTD
Original Signed By
Ronald FReed, P E
BW /mg
eLl ~TIIL -.Jp . IIITE 4 II . 1'~IIH Ix
C . I I [' I 4] S I 56 u' . I [2 I 4 I 3 ~ (1 III I I ~
REED EnGinEERinG
GEOTECHNICAL AND G R 0 U F"
ENVIRONMENTAL CONSULTANTS
REPORT OF FIELD GRADATION TESTS
Belt tine Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
.-
REPORTED TO IDI
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
A TTN Mr Chris Parnell
REPORT NO 119
REPORT DATE: 09-19-06
REG PROJECT NO 13335
TECHNICIAN L Johnson
PAGE. 1 of 1
CONTRACTOR Raymond Construction
Sieve Size
1-3/4"
Percent Passin
85
Date
08-30-06
I
Location
Fire Lane 400'S, 20'E(1)
Fire Lane 300'S, 25'E(1)
Fire Lane 200'S, 35'E(1)
Fire Lane 100'S, 25'E(1)
Fire Lane 2'S, 30'E(1)
I
Passing I
1-3/4" Sieve
100
100
100
100
100
Passing
3/4" Sieve
99
99
98
98
97
Footnote (1) Measurements referenced from N E building corner
Mail
Distribution (1) IDI/Mr Chris Parnell
(1) Raymond Construction/
Mr David Layne
(1) City of Coppell/Mr Larry Davis
(1) City of Coppell/Mr Lee Stone
Submitted by'
REED ENGINEERING GROUP, L TD
Original Signed By
. if
hf
'/J'l'~~
Bill Woolwine
Sr Manager, CMT
BW /mg
24"4 ~iUL [Ik . l'llt 411'1 . LJA_L~ l' ' '0. EL IL 4] :511 56011 . I [214] 35LJ LJuI9