Loading...
Freeport NIP(2.94)-CS060928DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM. Public Hearing Freeport North, Lot 4R Block A, Replat to establish a building site, various easements and fire lane to allow the development of a 51,360- square -foot, one- story office building on 6 4 acres of property located on Royal Lane, approximately 1,200 feet north of Bethel Road, at the request of Jack Evans, Pacheco Koch. STAFF REP.: Matt Steer PROJECT ID# RP -06 -0056 DRC DATE: September 28, 2006 and October 5, 2006 CONTACT. Kenneth M. Griffin, P.E., DinofEngineerin ,-/Public Works 9721304 -3686 COMMENT STATUS: I ✓PRELIMINARY I FIN.-AL I REIZI 1 Provide an agreement for maintenance of the shared fire line 2 Fire hydrant spacing shall not exceed 300' along fire lane 3 Water line is private, not public 4 Show FDC location • For your information, we are providing the following estimated fees These fees are based on the inforination provided, and may change prior to finalizing the project. Roadway Impact Fee $5,083 60 Water Impact Fee $11,844 Wastewater Impact Fee $4,797 In addition, construction Inspection fees In the amount of 2% of private paving, drainage, water and sewer and 4 ° ,/ o of public work will be collected at the time of permitting See the attached sheet entitled "General Engineering Plan Review Process" for information on review process DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM Freeport North, Lot 4R, Block A, Site Plan to allow the development of a 51,360- square -foot, one -story office building on 6 4 acres of property located on Royal Lane, approximately 1,200 feet north of Bethel Road, at the request of Jack Evans, Pacheco Koch STAFF REP.: Matt Steer PROJECT ID# SPA 06 -0055 DRC DATE: September 28, 2006 and October S, 2006 CONTACT. Kenneth M. Griffin, P.E., Dir.ofEngineering /Public Works 9721304 -3686 COMMENT STATUS: I ✓PRELIMINARY I ' �T�E No Comments