Loading...
TR0301-LR060828 LAWRENCE ENGINEERING ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas, Texas 75243 Phone (972) 497-9100 Fax (972) 497-9108 CLIENT PROJECT LE REPORT #" REPORT DATE CONCRETE INSPECTION AND COMPRESSION TEST REPORT City of coppell Traffic Signal Improvements C06-0707 -08 8/28/06 REPORT DISTRIBUTION Rick O'Dell - City of Coppell Strength (pSI) Slump (in) Air Content 1%) Concrete Temp (OF) SPECIFICATIONS 4000 @ 28 days 3-5 3-6 95 max PROJECT DATA Placement Date 7/27/2006 Sampled By' J Flores Weather' Hot Supplier/Mix: LMC I 1701 Ticket #. Slump (in) Conc Temp (OF) Placement Location Remarks FIELD DATA SET #1 3217969 Time Batched 1 05 PM Time Sampled 5 0 Air Content. 4 9 Unit Weight: 90 Ambient Temp (OF) 99 Yardage (c y ) Piers - #2 and #3 at intersection of Macarthur and Beltline 2 02 PM N/A 8 of 8 Ticket #' Slump (in) Conc Temp (OF) Placement Location Remarks FIELD DATA SET# Time Batched Air Content. Ambient Temp (OF) Time Sampled. Unit Weight: Yardage (c y ) CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set # Cylinder # Test Date AQe (Days) Max Load (Ibs) Area (sq in) Strenath (psi) FC Notes 1-1 8/3/2006 7 94910 2827 3360 C 1 1-2 8/3/2006 7 92920 2827 3290 B 1-3 8/24/2006 28 121930 2827 4310 D 1-4 8/24/2006 28 116430 2827 4120 C ill NORMAL CYLINDER SIZE 6" X 12" AREA 2827 sq in. UNLESS NOTED ABOVE (2) FAILURE TYPE A=CONE. B=CONE AND SPLIT C=CONE AND SHEAR D=SHEAR E=COLUMNAR '31 TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES <4) F!ELD TESTS ARE PER APPLICABLE ASTM STANDARDS C138 C143 C172. C231 ~~\J LAWRENCE E ~~~ERI~ 68 ::8 0," L.lProJects\prOJ8cts 2006\C06-0707 Traffic Slgnallmprovements\C06-0707-08 Concrete Insp Report 7-27