Loading...
TR0301-LR060807 LAWRENCE ENGINEERING ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas Texas 75243 Phone (972) 497-9100 Fax (972) 497-9108 CLIENT PROJECT LE REPORT # REPORT DATE CONCRETE INSPECTION AND COMPRESSION TEST REPORT City of coppell REPORT DISTRIBUTION Traffic Signal Improvements Rick O'Dell - City of coppell c06-0707 -02 8/7/06 Strength 1 pSI) Slump I in I Air Content I % I Concrete Temp ICF) SPECIFICATIONS 4000 @ 28 days 3 - 5 3-6 95 max PROJECT DATA Placement Date 7/10/2006 Sampled By- A Maya Weather- Sunny Supplier/Mix LMC 1 1701 Ticket #- Slump {in I Conc Temp (eF) Placement Location Remarks FIELD DATA SET #1 7167336 Time Batched 12 28 PM Time Sampled 4 0 Air Content 4 0 Unit Weight: 88 Ambient Temp (OF) 91 Yardage (c y ) Three (3) Light pole foundations - SE, NE, NW corners of MacArthur Blvd 1 25 PM N/A 10 & Bethel Sch Rd Ticket # Slump (in I Conc Temp (oF) Placement Location Remarks FIELD DATA SET# Time Batched Air Content- Ambient Temp (oF) Time Sampled Unit Weight: Yardage IC y ) CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39 Set# Cylinder # Test Date Age (Days) Max Load (Ibs) Area (sq In ) Strenqth (psi) FC Notes 1-1 7/17/2006 7 116320 2827 4110 C 1 1-2 7/17/2006 7 114330 2827 4040 C 1-3 8/7/2006 28 130810 2827 4630 0 1-4 8/7/2006 28 138670 2827 4910 0 (1) NORMAL ::::YLlNDER SIZE 6")( 12" AREA 2827 sq In UNLESS NOTED ABOVE (2) FAILURE TYPE A=CONE B=CONE AND SPLIT C=CONE AND SHEAR D=SHEAR E=COLUMNAR ,3) TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED IN NOTES (4) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS C138 C143 C172 C231 K~iVv~ K~~ LAWRENCE ENGINEERING B J J 1 crio 1..,Proiects\Prowcts 2006\C06-0707 Traffic SlgnallmprovementsIC06-0707-02 Concrete !nsp Repon 7-10 xis -',.,._ .AJ';/Arr/~