September 13, 200fi
Mr Keith Marvin
City of Coppell
RF. Denton Tap Median
Dear Keith,
~~llVl~~~
Civil Divislpn
The purpose of this letter is to request reimbursement to our company for
additional costs incurred on the project.
2526 v1 Pafford St
Fon Wonh, Texas 76110
Billing Adgress
P 0. Bax 1 1 ¢23
Fon Worth TX 761 1 0-0423
As you know, on 8/25/08, our company began pouring the concrete in the area of
the median to be stamped and colored. We had planned to use the "shake-ten"
method to achieve the color specified by the city. We had poured 4 CY of
concrete when the city inspector informed us that the "shake-0n" method was not
acceptable and instructed us to remove the concrete already in place and re-pour
wrth an integral color We removed 2 CY and left 2 CY to form the sub base
We regret that there was a misunderstanding regarding this matter. However,
according to the drawn~gs furnished by the city, the method to be used to color
the concrete was not specified. Therefore, we feel that the additional work
resulting from the city's instructions described above caused additional costs to
be added to the project that were not antiapated. We are requesting
reimbursement for these Costs {without markup} in the amount of $1,000 00
{See the attached detail)
For future consideration, the "shake-on° method is accepted by Bomanite
{Bomanite Bulletin 200 6}. Some, in fact, consider this method to be better than
using integral color because of the greater ability to maintain uniform surface
f~?Ipr
Please advise regardirFg the city's p08it~on concerning this request. Let me know
rf you have any questions or would like to meet to discuss this issue further
Sincerely,
Lynn Fowler
Project Manager
Contractor of the Year 2002
American Public Works Association /North Central Texas Chapter
-- -_ ~ _ - r - :- -- - -- r
Ed A. Wilson, Inc.
CoppelUl~enton Tap Median Improvements
Costs to Repour Median
Labor MH Cost
Crew (4 men x 3 hrs) 12 $ 200
Operator/Driver 3 $ 50
SupervisioMMgmt (JW, JP, LF) $ 150
$ 400
Material
Concrete 2 CY ~ 150
Shake on color $ 150
$ 304
FquipmentNehicles
Dump Truck 3 hrs $ 104
Dump Fees S 54
Vehicles 2 ~ $ 54
Backhoe 2 hrs $ 104
$ 344
Overhead and Profit $0 QO
TOTAL $ 1,400
256 VV Pafford Si. ror: ~~'durth TX ~C ~ 1G
31'-923-6400 ~o~ce 31 ; -9~3-G?az Fats+rnile
~~
To ~ ~ (~~ ~ ~,~f 1 ~ FrotYt; f`YNN FOWLER
Company: Pages: -~
Fax. -i~ a--~'b~- ~S'~~ Date: ~~+3-0~0
Re: l~J~tJT~ ~Y~~ ~~L~~~1t!
~ Urgent C?I For your use ~ Please Comment ~ original to fallow
• Comments: