.luly 11, 2006
Knox Ross, Secretary /Treasurer
Ed A Wilson, Inc
:'526 W Pafford St
Fort Worth , X 761 10
�y�
RE MacArthur B1\ d ' Cnbbs Dr Drainage Project # DR 06 -01
Pre - Construction Meeting revised
Dear Mr Ross
A pre - construction conference on the referenced project has been rescheduled for
"Thursday, July 13, 2006 at 11:00 a.m. in the 2' Floor C onference Room in Town
Center at 255 ParkvN av 131� d
Please notify the franchised uthhty companies, contractors, sub - contractors, testing lab
and any other interested parties of the re ised date so that they may have a representatix e
Present If you hay e any questions concerning this project prior to the scheduled meeting,
feel free to contact me at ( 972) 304 -7090
Sincerely,
Rick O'Dell, Construction Inspector
Office Phone 972 -304 -7090
Fax 972- 304 -3570
cc Ken Griffin, Director of Engineering & Public Works
Glenn Hollowell, Asst Director of Public Works
Keith Marvin, Asst City Engineer
I H E C I 7 Y O F
COPPELL
i
July 10 2006
Knox Ross, Secretar% Treasurer
Fd A Wilson, Inc
2526 NA' Pafford St
Fort Worth, TX 76I 10
FAX �s'3/'I (-12_
RF MacArthur BIN Cnbbs Dr Drainage Project � DR 06 -01
Pre - Construction Meeting
Dear %Ir Ross
A pre - construction conference on the referenced project has been scheduled for
�k ednesda July 12 2006 at 9 00 a m in the I obbv Conference Room in Town Center at
2» Parkv %aN Bled
Please notifv the franchised ut1l1t} companies, contractors, sub- contractors testing lab
and anti other interested parties so that they ma} llav e a representati%e present If %ou
have any questions concerning this pro)c.Lt prior to the scheduled meeting, feel free to
contact rile at (9 ) 3,04- 7O9O
��ncercl�
Ri O'D�,I1, Construction Inspector
Office Phone 972 -3(i4- 71190
Faa 1 )'2- 304 -35
Lc Ken Griff Director of Engineering & Public Forks
Glenn Hollo« ell, Asst Director of Pubhc Works
Keith %larN in, Asst City Engineer
RESPONSIBILITY FOR PRE - CONSTRUCTION
MEETING NOTIFICATION
The owner / owner's representative will be notified of the date, time and place of
the pre - construction meeting once it is scheduled by the Construction Inspector
assigned to the project
It is the owner/ owner representative's responsibility to notify the following
parties
• Franchise Utilities (including but not limited to electric, gas, cable, &
telephone providers)
• Geotechnical firm
• Project Engineer
• Contractors or subcontractors for excavation, utility, & paving operations
• SWPPP representative