Loading...
MA FY 0506-LR060815Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 15 August 2006 PROJECT: City of Coppell Street Repair Project SUPPLIER: Pavement Services Job #05 -267, Coppell, TX LOCATION OF POUR SET 1: Alley paving replacement behind 149 Oakbrook Drive @ 0' -25' south of north end of pour LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 2021 Cement Ticket No. Flyash Time Batched 8:14am Sand Time Sampled 8:15am in. Concrete Temp. (ASTM C1064) 90 ° F 1.0 in. Air Content (ASTM 0231) 2.0% Water Unit Weight (ASTM 0138) Admix #1 Ambient Temp. Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 564 4.00 7 08/22/06 88,600 3130 565 4.00 7 08/22/06 89,800 3180 566 4.00 28 09/12/06 118 4210 567 4.00 28 09/12/06 119,900 4240 28 -Day Average 4230 4000 TECHNICIAN: RJW (7:30am- 9:30am) DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell r ' 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148