Loading...
MA FY 0506-LR060812Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO 02 1077 CLIENT Pavement Services Corp DATE 12 August 2006 PROJECT City of Coppell Street Repair Project SUPPLIER Pavement Services Job #05 -267, Coppell, TX LOCATION OF POUR SET 1 Paving, left lane of southbound MacArthur Blvd , approx 0' -30' south of Cribbs Drive LOCATION OF POUR SET 2 SAMPLE DATA SET 1 SET 2 MIX NO 6 sks w/ accel Truck No 2019 Cement Ticket No Flyash Time Batched 12 05pm Sand Time Sampled 12 05pm in. Concrete Temp (ASTM C1064) 95 °F 1 0 in Air Content (ASTM c231) Water Unit Weight (ASTM C138) Admix #1 Ambient Temp Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM Cis) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM 0143) psi Strength 559 600 2 08/14/06 70,200 2480 560 600 6 08/18/06 83,400 2950 561 600 7 08/19/06 94,100 3330 562 600 28 09/09/06 134,000 4740 563 600 28 09/09/06 128,200 4530 28 -Day Average 4640 4000 TECHNICIAN MFM (10 30am -1 OOpm) DISTRIBUTION (1) Pavement Services Corp (1) City of Coppell F AI i / i r 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148