Loading...
MA FY 0506-LR060809Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO 02 1077 CLIENT Pavement Services Corp DATE 9 August 2006 PROJECT City of Coppell Street Repair Project SUPPLIER Pavement Services Job #05 -267, Coppell, TX LOCATION OF POUR SET 1 Alley paving replacement @ 137 Oakbrook, east half LOCATION OF POUR SET 2 SAMPLE DATA SET 1 SET 2 Truck No 2020 Ticket No 2620 Time Batched 9 30am Time Sampled 9 30am Concrete Temp (ASTM C1064) 90 °F Air Content (ASTM 0231) 5 00 Unit Weight (ASTM C138) 09/06/06 Ambient Temp 5620 MIX NO 6 sks Cement Flyash Sand in 1 0 in Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28 -Day (ASTM C143) psi Strength 550 5 00 7 08/16/06 74,200 2620 551 500 7 08/16/06 72,200 2550 552 5 00 28 09/06/06 159,000 5620 553 5 00 28 09/06/06 181,700 6430 28 -Day Average TECHNICIAN CDJ (9 00am -11 00am) DISTRIBUTION (1) Pavement Services Corp (1) City of Coppell 4000 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351 -6419 Fax (214) 351 -5148