Loading...
ST9902-CS060720 (2)Page 1 of 2 Paula Crocker - Re: Bricknell Closure Is From: "The Farnum's" <lfl2281987 @msn com> To: "Ken Griffin" <kgriffin @ci coppell tx us> Date: 7/20/2006 8 46 PM Subject: Re Bricknell Closure CC: "Paula Crocker" <PCROCKER @ci coppell tx us> Mr Griffin Thank you for your email reply Drivers are responsible for following posted speed limits within the entire City of Coppell, not only neighborhood streets, and our police department is responsible for enforcement I do not understand closure of a public roadway for the purpose of limiting "neighborhood cut through traffic" Karen Farnum - - - -- Original Message - - - -- From Ken Griffin To The Farnum's <lf12281987 @msn corn The Farnum's Cc Paula Crocker Sent Thursday, July 20, 2006 9.25 AM Subject: Bricknell Closure To facilitate the construction of the Sandy Lake /coppell Road intersection, the City Council authorized the closure of that intersection for the summer months One concern we had was that traffic would attempt to cut through Bricknell to bypass the closed intersection. Therefore, to protect the adjacent neighborhood from cut through traffic, we posted "No Through Traffic" signs at each end of the subdivision. Those signs were not effective, so we monitored Bricknell and followed up the "No Through Traffic" signs with the closure of the intersection of Eastwick and Coppell Road so vehicles could not gain access to Bricknell However, vehicles then entered Bricknell off of Mmyard Drive and continued to use Bricknell as a cut through to Sandy Lake The Police Department then stepped up enforcement of the "No Through Traffic" signs, but even that did not deter the cut through traffic As a last resort, we closed Bricknell south of Eastwick This effectually forces traffic to stay on the collector and arterial streets (Parkway to Denton Tap to Sandy Lake) to reach the Sandy Lake /Coppell Road intersection. While this was a drastic measure, it is temporary (the Sandy Lake /Coppell Road intersection must be opened to traffic no later than August 11th) and it did stop the cut through traffic If you have any additional questions, please contact me at the phone number or email address below Thank You, Ken Griffin, P E file //C \ Documents % % \PCROCKER \Local' /o20Settings \Temp \GW }0000 7/21/2006 Page 1 of 1 Paula Crocker - Bricknell Closure From: Ken Griffin To: "The Farnum's" Date: 7/20/2006 9 25 AM Subject: Bricknell Closure CC: Paula Crocker To facilitate the construction of the Sandy Lake /Coppell Road intersection, the City Council authorized the closure of that intersection for the summer months One concern we had was that traffic would attempt to cut through Bricknell to bypass the closed intersection. Therefore, to protect the adjacent neighborhood from cut through traffic, we posted "No Through Traffic" signs at each end of the subdivision Those signs were not effective, so we monitored Bricknell and followed up the "No Through Traffic" signs with the closure of the intersection of Eastwick and Coppell Road so vehicles could not gain access to Bricknell However, vehicles then entered Bricknell off of Mmyard Drive and continued to use Bricknell as a cut through to Sandy Lake The Police Department then stepped up enforcement of the "No Through Traffic" signs, but even that did not deter the cut through traffic As a last resort, we closed Bricknell south of Eastwick. This effectually forces traffic to stay on the collector and arterial streets (Parkway to Denton Tap to Sandy Lake) to reach the Sandy Lake /Coppell Road intersection While this was a drastic measure, it is temporary (the Sandy Lake /Coppell Road intersection must be opened to traffic no later than August 11 th) and it did stop the cut through traffic If you have any additional questions, please contact ine at the phone number or email address below Thank You, Ken Griffin, P E Director of Engineering/Public Works 972- 304 -3686 I,�Ori ff n�a ci Coppell ty us >>> "The Farnum's" <lf1228l987CWmsn.com> 7/19/2006 11 26 AM >» Why is Bricknell closed to thru traffic' I don't see any construction activities on this road. file //C ` Do cuments °o \PCROCKER \Local %20Settings\Temp \GW }0000 7/20/2006